Laserfiche WebLink
Attachment B <br />Grand Mesa #1— Needs camplete rewor?� of outlet. This will require insitu form liner on the <br />downstream side of the e�sting valve, remo�val of dirt on th� upstream side and � dtand the crest <br />new piping along with new valve (See attachment C). The spillwaY needs en�a�'g <br />needs to be raised. .A grout curtaan needs to be installed in the dam ta control small. leak. <br />Grand 1�✓Iesa #9-- Needs approx. the same valve work as Grand Mes� # 1. <br />The two projects described alwve will complEte the refurbishing of the six reservoirs owned by <br />the Grand Mesa Reservoir Company and � reek Vallee s�hare holder�s.e �ed with full <br />agricultural use of the water for the K:a�nnah Y <br />