My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Armel Tour, Investigation, Data and Maps
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Armel Tour, Investigation, Data and Maps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 1:51:18 PM
Creation date
8/10/2010 1:48:24 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Armel Irrigation Project, Bonny Dam
State
CO
Basin
South Platte
Water Division
1
Date
5/14/1970
Author
Bureau of Reclamation
Title
Armel Tour, Investigation, Data and Maps
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Natu of pro involved: <br />The determination of the most effective and economical means of <br />service by means of a pumping plant to the project tablelands, <br />using current design criteria and canal lining policies. <br />4. C oord i nati on wit oth er agencies: <br />The investigation will be closely coordinated with studies of <br />other interested Federal and State agencies to assure that Plans <br />will reflect the most practicable development of the unit. The <br />Colorado Water Conservation Board has indicated its strong support <br />for the development of feasibility studies. <br />5. Indication of interest: <br />The investigation will be made by the Kansas :river Projects Office. <br />Indications of interest and requests for specific studies should be <br />directed to the Project Manager, Bureau of neclamation,.Kansas River <br />Projects, P. 0. Box 737, 'McCook, Nebraska 69001. <br />
The URL can be used to link to this page
Your browser does not support the video tag.