My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chapter VII Financial Program
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Chapter VII Financial Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 11:27:28 AM
Creation date
8/9/2010 2:37:23 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Long Draw Reservoir Enlargement; Small Reclamation Projects; Fort Collins
Basin
South Platte
Water Division
1
Date
4/8/1969
Title
Chapter VII Financial Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rev. V 8 8-69 <br />work done in each year, including the test sections planned for the <br />first two years, to become plant -in- service at the end of the same <br />year. It is planned that Recreation Facilities will be constructed <br />concurrently with the Dam, Spillway and Outlet Works and all will <br />become plant -in- service at the end of the second year. <br />Computation of interest during construction is based on the <br />construction schedule shown in Table VII -F and is shown in Table VII -A. <br />Interest during construction is introduced as a component of the <br />capital cost of the project for allocation purposes and has no rela- <br />tionship to interest to be charged on any loan to the Company. <br />Table VII -A also shows the computation of interest during <br />construction with a project purpose omitted. The difference between <br />the interest during construction for the multi- purpose project and <br />for one with a function omitted is the separable cost used in cost <br />allocation procedures shown in Table VII -C. In this particular case <br />the single purpose alternate would be the same as the multi- purpose <br />project with the other function omitted. <br />3. Operation, Maintenance & Replacement Expense <br />The annual OM &R expense for the dam and for the collection ditch <br />is not expected to change as a result of the project. Elsewhere in <br />this Report it was estimated that average future OM &R costs of the <br />Grand River Ditch and Long Draw Reservoir will be $25,250 annually. <br />The collection ditch rehabilitation portion of the project is being <br />designed for the purpose of reducing seepage and other losses, rather <br />than for any specific reduction in OM &R expense. It is expected that <br />any reduction in expense that might tend to accrue as a result of <br />general improvement of the ditch would be offset by (1) the effort <br />needed to maintain the banks of the ditch in better condition in <br />order to contain the increased flow which the ditch will be required <br />to handle, (2) the need to use more care and more sophisticated <br />equipment, than in the past, in cleaning the newly lined reaches of <br />the ditch, in order to avoid damaging the new ditch lining, and <br />(3) extra work in getting the ditch open earlier in the season. <br />The establishment of Recreational Facilities is estimated by <br />the Forest Service to incur the following new annual OM &R costs: <br />(1) Personnel services for increased fire <br />protection and general administration: <br />2 men @ 60 days /year @ $25 /day /man $3,000 <br />(2) Maintenance and policing of recreation <br />areas: 33,000 visits @ $0.10 3,300 <br />(3) Annual repair: 85 units @ $25 /unit 2 <br />(4) Annual maintenance of boat ramp & miscellaneous 500 <br />Total $8,925 <br />The present worth of these annual expenditures for 100 years <br />at 4 -5/8% is $190,900. <br />
The URL can be used to link to this page
Your browser does not support the video tag.