Laserfiche WebLink
67 <br />Rev. 4 -8 -69 <br />Long Draw Reservoir Construction <br />Dam, Spillway and Outlet Works <br />Estimated contract cost <br />Investigations, surveys, preparation of <br />proposal, and all engineering through <br />preparation of detailed plans and <br />specifications <br />Engineering during construction <br />Recreational Facilities <br />Estimated construction cost <br />Advance planning <br />Subtotal <br />Bureau of Reclamation Participation <br />Total, Long Draw Reservoir Construction <br />Grand River Ditch Rehabilitation <br />Estimated contract cost <br />Investigations, surveys, preparation <br />of proposal, and'all engineering <br />through preparation of detailed plans <br />and specifications <br />Engineering during construction <br />Bureau of Reclamation Participation <br />Total, Grand River Ditch Construction <br />The total project cost is as follows: <br />Long Draw Reservoir Construction <br />Grand River Ditch Construction <br />Total, Project Cost <br />$1,006,500 <br />110,700 <br />$1,117,200 <br />40,300 <br />$1,157,500 <br />$ 184,900 <br />7,500 <br />192,400 <br />$1,349,900 <br />27,600 <br />$1,377,500 <br />$ 315,800 <br />34,800 <br />12,600 <br />7,400 <br />$ 350,600 <br />20,000 <br />$ 370,600 <br />$1,377,500 <br />370,600 <br />$1,748,100 <br />2. Interest During Construction <br />Construction of the Dam, Spillway and Outlet Works is scheduled to <br />span a two -year period, with no benefits to be available until comple- <br />tion of this portion of the project. Rehabilitation of the Grand River <br />Ditch is planned to cover the third, fourth, and fifth years, with the <br />