My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Projected Planning Study Waterworks Facilities: City of Loveland, Colorado
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Projected Planning Study Waterworks Facilities: City of Loveland, Colorado
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2010 1:10:43 PM
Creation date
8/9/2010 12:46:15 PM
Metadata
Fields
Template:
Water Supply Protection
Description
City of Loveland
State
CO
Basin
South Platte
Water Division
1
Date
5/25/1961
Author
City of Loveland, William D. Patterson
Title
Projected Planning Study Waterworks Facilities: City of Loveland, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
--.AAA <br />Figure 3 Figure 4 <br />' GRIT CHAMBER (Figure 5) This unit is theoretically capable of handling <br />' 8 MGD with a retention time of 18 minutes although it is suspected that the <br />actual time of retention is somewhat less, due to "short- circuiting" of <br />' fluid streams. It is our belief that the flow through this unit can be <br />' increased to 10 MGD without seriously effecting the operational qualities <br />after the new grit chamber is constructed. <br />- 30 - <br />Figure 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.