Laserfiche WebLink
--.AAA <br />Figure 3 Figure 4 <br />' GRIT CHAMBER (Figure 5) This unit is theoretically capable of handling <br />' 8 MGD with a retention time of 18 minutes although it is suspected that the <br />actual time of retention is somewhat less, due to "short- circuiting" of <br />' fluid streams. It is our belief that the flow through this unit can be <br />' increased to 10 MGD without seriously effecting the operational qualities <br />after the new grit chamber is constructed. <br />- 30 - <br />Figure 5 <br />