My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Small Reclamation Projects Application Report for the North Poudre Irrigation Company: Park Creek Dam Project
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Small Reclamation Projects Application Report for the North Poudre Irrigation Company: Park Creek Dam Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 12:02:58 PM
Creation date
8/6/2010 11:39:23 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Park Creek Dam, Project P.L. 984, North Poudre Irrigation Company
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1965
Author
Phillips-Carter-Osborn Inc., Engineering Consultants
Title
Small Reclamation Projects Application Report for the North Poudre Irrigation Company: Park Creek Dam Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Costs <br />Dam, Spillway and Outlet Works <br />Modifications to Halligan Dam <br />Subtotal <br />Engineering and Administration <br />@ 10 0 /0 <br />Company Program <br />Performed with loan funds <br />Company contribution (excludes <br />$1, 000 filing fee) <br />$ 815,500 <br />$ 34,500 <br />$ 850,000 <br />$ <br />85,000 <br />$ <br />935,000 <br />Aquisition of rights -of -way $32, 000 <br />Preparation of loan ap- <br />plication report $ 12,000 <br />Subtotal Company <br />Contributions $44,000 44,000 <br />Total Company Program $ 979,000 <br />Bureau of Reclamation Program <br />Examining and processing loan <br />application and Administration of <br />loan (includes $1, 000 filing fee) $ 18,000 <br />TOTAL PROJECT COST $ 997,000 <br />5. OPERATION AND MAINTENANC <br />Present Costs. The average total operation, maintenance and general <br />expenses for the period 1962 through 1964 was $149, 694, 31 annually. <br />Costs of the Proposed Project. The estimated additional OM &R cost <br />due to the proposed new facilities is $2, 200 per year, <br />Sm7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.