My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rule 26(a)(2) Disclosures of Applicant, City of Durango
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Rule 26(a)(2) Disclosures of Applicant, City of Durango
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2010 12:39:29 PM
Creation date
7/26/2010 1:31:05 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Durango RICD
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
9/8/2006
Author
Moses, Wittemyer, Harrison and Woodruff, P.C., Veronica A. Sperling, Brian A. Knutsen
Title
Rule 26(a)(2) Disclosures of Applicant, City of Durango
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GARY B. THOMPSON, P.E. <br />City of Golden <br />Project engineer for initial dam construction feasibility studies, including site selection, flood <br />hydrology, and preliminary embankment design for the proposed Guanella Reservoir in <br />central Colorado. <br />Climax Molybdenum Company <br />Project engineer for design of Ute Creek Dam at the Henderson Mill in central Colorado. <br />PROJECT ENGINEERING <br />Parkville Water District, Leadville <br />Design, project management, and inspection of extensive water treatment, water storage, <br />and distribution system improvements. Long -term engineering services related to all <br />aspects of the municipal water system. <br />Climax Molybdenum Company <br />Design, project management, and inspection of large diameter pipelines for mill water <br />supply and runoff-interception at the Climax Mine near Leadville, Colorado. Planning for mill <br />water supply and dam rehabilitations. <br />Ward Canal Company, Denver Area <br />Project engineer for design of canal relocations and pipeline installations. <br />Widefield and Fountain <br />Project engineer for design of large capacity irrigation diversion facilities and pipeline. <br />Design of water treatment facilities and pump station. <br />ANALYSIS AND CHANGES OF WATER RIGHTS; NEWAPPROPRIATIONS; <br />AUGMENTATION PLANS <br />City of Aspen <br />Baca Grande Water & Sanitation District <br />Blue River Irrigation Company - near Dillon <br />Box Springs Reservoir and Canal Company <br />Town of Castle Rock <br />Chaffee County <br />Clear Creek Water Users Alliance. <br />Climax Molybdenum Company <br />Comanche Resources - near Fountain <br />Cuchara Valley Resort <br />Denver International Airport <br />Denver Water Department <br />Eagle Sky Foundation — near Leadville <br />East Cherry Creek Valley Water and Sanitation District <br />El Paso County School District <br />Empire Lodge - near Leadville <br />Fairfield Communities - near Pagosa Springs <br />City of Fountain <br />Fountain Valley School <br />City of Golden <br />Page 3 W. W. Wheeler <br />and Associates, inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.