My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150194 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150194 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2011 3:54:12 PM
Creation date
7/23/2010 12:06:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150194
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
2
County
Adams
Morgan
Weld
Bill Number
SB 05-084
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
perFormance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BoRROVVER may issue the notice to proceed to the <br />Construction Firms. <br />I. The BoRROwER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />J. If the CWCB staff determines that the PRO�ECT requires a resident inspector during <br />construction, the BoRROwER shall employ an inspector who has been approved by <br />the CWCB staff. <br />K. The BoRROVVER shall construct the PRO�ECT in accordance with the approved plans <br />and specifications. <br />L. Upon completion of the PRO�ECT construction, the BoRROVVER shall provide as-built <br />drawings of the PRO�ECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br />the BoRROwER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. � <br />M. Upon completion of the PRO�ECT construction, the BoRROwER shall arrange a final <br />inspection for the CWCB staff. <br />SECrioN 8— ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br />A. Engineering associated with the feasibility report prepared as a requirement for this <br />loan and associated with evaluating the suitability of the water rights for purchase <br />by the BoRROwER. <br />B. Interest during completion of the PRO�ECr pursuant to Paragraph A.4 herein. <br />C. Legal services for reviewing engineering services contracts and this Contract. <br />D. Purchase of the water rights. <br />E. Preparing final designs and specifications for the PRO�ECT. <br />F. Preparing bid and construction contract documents. <br />G. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />H. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />I. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />J. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BoRROwER. <br />K. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />Appendix 1 to Loan Contract C150194 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.