My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150194 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150194 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2011 3:54:12 PM
Creation date
7/23/2010 12:06:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150194
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
2
County
Adams
Morgan
Weld
Bill Number
SB 05-084
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
loan origination fee of 1% in accordance with CWCB Policy No. 16, at an interest rate <br />of 2.50% per annum for a repayment term of 30 years. <br />B. Pursuant to Bill SB05-084, the Colorado General Assembly authorized CWCB to <br />loan to the BoRROwER an amount up to $20,200,000 for the PRO�ECT <br />SECTION 5— SCHEDULE OF EXISTING DEBT <br />BORROWER's existing debt consists of a Limited Tax General Obligation Note, principal <br />amount of $9,000,000, dated March 2, 2005. <br />SECTION 6— ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />Upon execution of this LoaN Con►rRacT, the BoRROwER may request disbursement of <br />funds according to the procedures described belaw for an amount up to $11,200,000. <br />The remaining $9,000,000 will be disbursed to the BORROWER according to the <br />procedures described below only after such date that the BORROWER provides the <br />CWCB wi#h a written letter stating that the BoRROwER defeased its Limited Tax General <br />Obligation Note, principal amount of $9,000,000, dated March 2, 2005. <br />SECTION 7—PROCEDURES FOR WATER �URCHASE PROJECTS AND CONSTRUCTION PROJECTS <br />A. The BoRROwER must submit a written appraisal or opinion of value from a qualified <br />water rights appraiser supporting the purchase price prior to disbursal of loan <br />funds. <br />B. The BoRROVVER shall pay all of the expenses related to the PRO�ECT when such <br />bills are due. <br />C. The BoRROVUER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ECr. <br />D. The BoRROwER's and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />E. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROVVER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />F. CWCB staff must be present at bid opening and must approve the award of the <br />canstruction contract. <br />G. The BoRROVUER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BoRROVUER and found acceptable by the CWCB staff. <br />H. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />Appendix 1 to Loan Contract C150194 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.