My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Watershed Program in Colorado (Pilot and Public Law 566) (3)
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
The Watershed Program in Colorado (Pilot and Public Law 566) (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2010 11:44:58 AM
Creation date
7/21/2010 1:09:39 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Status of P.L. 566 Projects and Flood Control Schedules
State
CO
Date
11/1/1972
Author
Colorado State Office Soil Conservation Service
Title
The Watershed Program in Colorado (Pilot and Public Law 566)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 5 - <br />properties west of La Junta, Colorado. Estimated cost of the project <br />is $1,891,990 ($1,169,400 PL 566 and $721,600 other costs) with a <br />five year installation period. Approved October 9, 1970. Construction <br />started June, 1972. Two of the four planned floodwater retarding <br />structures are nearing completion of construction. Construction <br />funds for the remaining structures are scheduled to be obligated in <br />this fiscal year. <br />Authorized Watershed Projects Not in Construction (Public-Law 566) <br />Vineland Watershed Project (Pueblo County) - Project area is 11,110 acres. <br />It is sponsored by the Bessemer and Pueblo Soil Conservation Districts. <br />The Vineland Flood Conservancy District was formed to provide project <br />land rights and the Colorado State Soil Conservation Board has <br />recently joined as co- sponsors.. The plan provides a program of land <br />treatment and structural measures, consisting of four floodwater- <br />retarding structures, one canal flood regulating and wasteway structure <br />and two floodway channels, to protect valuable irrigated farmlands, <br />community of Vineland and state and county roads from floodwater, <br />sediment and erosion damages. The estimated cost of the project is <br />$654,807 ($410,765 PL 566 and $244,042 other costs). Easement <br />problems.have prevented starting construction on this project. <br />Suspended 1968. <br />The attached tabulation summarizes project installed costs as completed and <br />as estimated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.