My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150243 Contract
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150243 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 11:57:12 AM
Creation date
7/21/2010 1:02:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150243
Contractor Name
Aurora, City of
Contract Type
Loan
Water District
0
County
Adams
Bill Number
SB 07-122
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
; <br />engineering recommendations are accepted, construction costs could be reduced. Because <br />construction costs may vary depending on market conditions and other factors at bidding <br />time, it is requested that the actual percentage of construction contractor invoices to be paid <br />by the CWCB as part of the loan be determined at a later date. <br />In addition, strategies for packaging the work are being considered. Depending on which if <br />any additional value engineering or construction packaging modifications are incorporated, <br />additional engineering design work may also be required. <br />Implementation Schedule <br />The baseline schedule for construction of the PWP Conveyance System bid packages is <br />shown in Figure 9 below. <br />;z:s�„-a� <br />24,:Iatt�II9� <br />S9-/�ar-08 " - �- • _.. <br />� 19Yhiar-l0 <br />PICp. H Gonveyanec Pip917ne �2 <br />OT�-MayAB . . . 03�-trTay t6� <br />?�;lvrnq8 <br />___. I Pkg: E Pu1nRIn4� StaiEams 1. 2; & 3! <br />� <br />E <br />FIGURE 9. PWP CONVEYANCE SYSTEM BASELINE CONSTRUCTION SCHEDULE <br />Bid Packages E, G, H, a��i I a�e curreritly in desigri. Desigri activities are nearing completion. <br />The bidding process will begin for the first Conveyance System bid package in the second <br />quarter of 2007. Construction is expected to begin on Bid Package I, Conveyance Pipeline <br />Segment 3, in September 2007. The bidding and award process for the remaining bid <br />packages will begin either late in the fourth quarter of 2007 or early in the first quarter of <br />2008. Construction of the other pipelines and pumping stations is expected to begin in the <br />second quarter of 2008. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.