; <br />engineering recommendations are accepted, construction costs could be reduced. Because <br />construction costs may vary depending on market conditions and other factors at bidding <br />time, it is requested that the actual percentage of construction contractor invoices to be paid <br />by the CWCB as part of the loan be determined at a later date. <br />In addition, strategies for packaging the work are being considered. Depending on which if <br />any additional value engineering or construction packaging modifications are incorporated, <br />additional engineering design work may also be required. <br />Implementation Schedule <br />The baseline schedule for construction of the PWP Conveyance System bid packages is <br />shown in Figure 9 below. <br />;z:s�„-a� <br />24,:Iatt�II9� <br />S9-/�ar-08 " - �- • _.. <br />� 19Yhiar-l0 <br />PICp. H Gonveyanec Pip917ne �2 <br />OT�-MayAB . . . 03�-trTay t6� <br />?�;lvrnq8 <br />___. I Pkg: E Pu1nRIn4� StaiEams 1. 2; & 3! <br />� <br />E <br />FIGURE 9. PWP CONVEYANCE SYSTEM BASELINE CONSTRUCTION SCHEDULE <br />Bid Packages E, G, H, a��i I a�e curreritly in desigri. Desigri activities are nearing completion. <br />The bidding process will begin for the first Conveyance System bid package in the second <br />quarter of 2007. Construction is expected to begin on Bid Package I, Conveyance Pipeline <br />Segment 3, in September 2007. The bidding and award process for the remaining bid <br />packages will begin either late in the fourth quarter of 2007 or early in the first quarter of <br />2008. Construction of the other pipelines and pumping stations is expected to begin in the <br />second quarter of 2008. <br />23 <br />