My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinchera Watershed Work Outline
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Trinchera Watershed Work Outline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:18:58 PM
Creation date
7/20/2010 3:34:08 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Trinchera Irrigation Company
State
CO
Basin
Rio Grande
Water Division
3
Date
6/29/1972
Author
Colorado State Conservationist
Title
Trinchera Watershed Work Outline
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Canal lining appears feasible for several laterals in this system. <br />Field investigations and a records search will be made to determine <br />irrigation efficiency and water requirements. Consumptive use will <br />be determined using TR -21 procedures. Company records and system <br />inflow - outflow measurements will be used to determine conveyance <br />efficiencies. <br />Plans are to utilize computer programs where applicable. At present <br />the computer is being used for project control and water consumptive <br />use calculations. <br />It is planned to use a computer program to select a "best" distribution <br />system and to make crop return value comparisons. Also, a U.S.G.S. <br />Analog Model Program will be utilised to predict effects of canal <br />lining to ground water tables and to pumping costs. <br />The following main measure quantities (approximate) are being considered: <br />I. Twenty miles of canal lining (9 laterals) with capacities of <br />100 to 15 c.f.s. will be surveyed for profile and cross <br />sections. <br />2. Realignment, totalling about one mile of the canal system. <br />3. One hundred turnout, measuring, and conveyance structures. <br />4. Pumping plant system for lands below the Smith Reservoir. <br />Economic <br />Basic Data <br />Land use and crops - Present land use and crops grown in the project <br />will be furnished by the superintendent of the Trinchera Irrigation <br />Company. <br />Composite Acre - Present project composite acre will be computed from <br />the crop data furnished by the irrigation company. <br />Crop Yields - Present crop yields will be obtained from the irrigation <br />company. Crop yield with and without project conditions will be based <br />upon: cropland yields, predictions by soil series for land resource <br />areas, Colorado agricultural statistics, and technicians working in <br />the project area. The State Resource Conservationist and his Staff <br />will correlate and supplement the above data, and will establish <br />cropping pattern and yields with and without project conditions. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.