My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinchera Irrigation Company Watershed Investigation Report
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Trinchera Irrigation Company Watershed Investigation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:18:37 PM
Creation date
7/20/2010 3:31:33 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Trinchera Irrigation Company
State
CO
Basin
Rio Grande
Water Division
3
Date
6/29/1972
Author
USDA, Soil Conservation Service
Title
Trinchera Irrigation Company Watershed Investigation Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A I. T T. R Pd A T C. 0 R A D I) I T I 0 N A L P 0 S S I 13 I L T T I i: S <br />Consideration was given to two additional possibilities. <br />1. Lining about 4.5 miles of the Sangre de Cris to-Trinchova <br />Diversion Canal. This Diversion has a flood right for 100 c.f.s. 'JI)e <br />frequency at which this flow has been in excess to prior rights does <br />not appear to justify lining. <br />An alternate to the 100 c.f.s. lined canal is a 60 c.f:s. <br />lined canal. The estimated construction cost for the 60 c.f.s. is <br />$281,180. <br />Economic feasibility to reduce seepage loss is que,tj.onable <br />for either the 100 or 60 c.f.s. lining. <br />2. The Mountain Home Reservoir approached capacity only once <br />in 60 years. At that time seepage in the emergency spillway 'section <br />caused lend slippage in the south abutment below the dam. The Colorado <br />State Engineer set the maximum height of storage at 96.0, four feet <br />below the emergency spillway crest. <br />An estimated construction cost for building a dike across <br />the emergency spillway and for a concrete chute spillway over the crest <br />of the dam is $99,000. <br />Economic feasibility is questionable due to the low <br />frequency of use for the top four feet of the conservation pool. <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.