My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Boulder Canyon Project Adjustment Act - In the Senate and House of Representatives of the US: A Bill
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Boulder Canyon Project Adjustment Act - In the Senate and House of Representatives of the US: A Bill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 2:37:26 PM
Creation date
7/19/2010 1:45:36 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Laws, Acts, and Policy Rulings Accedting CWCB and Colorado Water
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1937
Title
Boulder Canyon Project Adjustment Act - In the Senate and House of Representatives of the US: A Bill
Water Supply Pro - Doc Type
Legislation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br />SECTION 5. If at any time there shall be insufficient stuns in the <br />t <br />Colorado River Dam,fund to meet the requirements of this act, or of <br />regulations authorized hereby and promulgated by the Secretary, the <br />! s <br />Secretary of the Treasury, upon request- of the Secretary =of the <br />Interior., shall readvance to the said fund sums not exceeding in.the <br />aggregate the sn punt theretofore paid from the Colorado River Dam fund <br />into the Treasury. There is hereby a- Uthorized to-be appropriated out <br />1 <br />of any moneys in the'T reasury not otherwise appropriated such sums as <br />may be necessar y to make such readvances. All such readven ces shall <br />bear interest. <br />SECTION 6. Whenever by the terms of the Project Act or this act pay- <br />ment of interest is provided.for, and whenever interest. - shall enter into <br />any computation thereunder, such interest shall be computed at the rate of <br />3 per centum per annum, compounded annually. <br />SECTION 7. The first N25,000,000 of advances made to the Colorado <br />River Dam.fund for the Project shall be deemed to be the sum allocated to <br />flood control by Section 2(b) of the '.project Act and repayment thereof. <br />shall be deferred without interest until June 1, 1987, after which time <br />such advances so allocated to flood control , shall be repayable to the <br />Treasury as the Congress shall determine. <br />SECTION 8. The Secretary is hereby authorized from time to time to <br />promulgate such regulations and enter into such contracts.as he may find- <br />necessary or appropriate for carrying out the purposes of this Act m d the <br />Project Act, as- modified hereby, arid, by mutual consent, to terminate or <br />modify any such contract; provided, however, that no allotment of energy <br />to- any allottee made by-any rule-or regulation heretofore promulgated sha11 <br />be modified' or changed wi thout the consent of such allottee, <br />-7 <br />S � <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.