Laserfiche WebLink
flow of of 7.7 efs (Mar. 1— Mar. 31); 12.9 efs (Apr. 1— July 31); 7.7 cfs (Aug. 1 -Nov. <br />14); and 6.5 ofs (Nov. 15 — Feb. 29) is hereby entered to preserve the natural environment <br />to a reasonable degree in the - reach of Smith Fork Gunnison River between the upstream <br />and downstream points described in paragraph 4 above. The appropriation date for this <br />water right is January 25, 2005. <br />The priority herein awarded was filed in the water court in the year of 2006 and <br />shall be junior to all priorities filed in previous years. As between all rights filed in the <br />same calendar year, priorities shall be determined by historical date of appropriation and <br />not affected by the date of entry of ruling. The Applicant shall install and maintain such <br />measuring devices and keep such records as the Division Engineer may require for <br />administration of this right. <br />It is accordingly ORDERED that this Ruling shall be filed with the water clerk <br />subject to judicial review. <br />It is further ORDERED that a copy of this Ruling shall be filed with the Division <br />Engineer and the State Engineer. <br />Dated this day of _t- <br />4r <br />LI 2008. <br />No protest was filed in this matter. The foregoing Ruling is confirmed and approved, <br />and is made the Judgment and Decree of this Court. <br />DATED this day of Afam 2008. <br />1 <br />