My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Motion to Quash or Modify Subpoena and Order
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Motion to Quash or Modify Subpoena and Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2010 1:21:48 PM
Creation date
7/7/2010 3:25:52 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Case No. 00CW259 Vail RICD and Case No. 00CW281 Breckenridge RICD
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/2002
Author
Ken Salazar, Susan J. Schneider, John J. Cyran, Shana Smilovits
Title
Motion to Quash or Modify Subpoena and Order
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Robert S. Raucher, Ph.D., Stratus Consulting Inc., P.O. Box 4059, <br />Boulder, CO 80306 -4059, 303 -381 -8000, (will call). Estimated time of <br />testimony, including cross examination, 2 hours (1 hour if Breckenridge <br />case tried first). <br />C. Hostile Witness <br />1. Kenneth Knox, Assistant State Engineer, Colorado Division of Water <br />Resources, 1313 Sherman Street, Room 818, Denver, Colorado 80203, <br />(will call). Estimated time of testimony, including cross examination, 1 <br />hour. (%2 hour if Breckenridge case tried first). <br />In addition to the above, the District may call: <br />1. Any and all witnesses listed by Objectors; <br />2. Any and all witnesses necessary to lay foundation for the introduction of <br />any exhibit; and <br />3. Any and all witnesses necessary for rebuttal or impeachment. <br />Tm0269 <br />z EXHIBIT <br />-2- <br />A1, <br />
The URL can be used to link to this page
Your browser does not support the video tag.