My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MoU Between U.S. Fish and Wildlife Service and Yampa River Basin Partnership
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
MoU Between U.S. Fish and Wildlife Service and Yampa River Basin Partnership
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 12:53:28 PM
Creation date
7/6/2010 1:40:30 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Yampa Technical Workgroup
State
CO
UT
WY
Basin
Yampa/White/Green
Water Division
6
Date
10/28/1997
Author
U.S. Fish and Wildlife Service, Yampa River Basin Partnership
Title
MoU Between U.S. Fish and Wildlife Service and Yampa River Basin Partnership
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGO NAT. RES. SECTION Fax :3038663558 Oct 28 '97 1151 P.14 <br />Yampa River Basin Endangered Fish Recovery <br />and Water Management Plan <br />Goal: To provide and protect the instream flows and habitat needed to <br />maintain and recover the endangered fishes, to protect other native <br />fish and wildlife resources, and to provide water for existing and <br />future human needs in the Yampa River Basin. <br />Task Description and Schedule <br />NEPA Scfln no <br />1. Conduct a study to determine the amount of water needed to augment <br />late summer /early fall flows for the endangered fishes in the Yampa <br />River. The Biology Committee and a panel of independent experts <br />will be assembled to review the results of the study and other <br />available information to make recommendations for augmenting late <br />summer /early fall flows for the endangered fishes in the Yampa River <br />under cur•renti:and' future cond-it•ions• (the years 2015 and 2040) . The <br />evaluation will address the tradeoff of the impact associated with <br />reducing the peak spring peak flows with the benefits associated <br />with augmenting late summer /fall flows in the Yarnpa River (1996 -July <br />. 1998) . <br />2. Conduct a study to evaluate if natural and man -made barriers <br />restrict fish movement in the Yampa River (1996 -July 1998 contingent <br />upon low flows.) <br />3. Review and update 1989 information describing the amount of water <br />-- that is needed to meet human needs in short- and long -term (the - <br />years 2015 and 2040, Determine the process for <br />conducting Section 7 1 'ESA consultation on the water needed to meet <br />short /long -term needs (October 1996 - September 1997 ). <br />I e of Evaluate Alternative Pursuant to NEPA: <br />4. Define purpose.and needs statement for the Plan and identify•and <br />agree upon alternative's for meeting the purpose and need <br />(January 1998- January 1999). <br />5. Collect and assemble missing information needed for the NEPA review <br />of alternative (May 1998- January 2000). <br />- - -.N PA Document Preparation, Record of Decision and Im le entation A reeme <br />6. Prepare draft NEPA document, Evaluate alternatives pursuant to the <br />National Environmental Policy Act (May 1998 - January 2000) (assumes <br />EIS). <br />1 <br />B <br />EXHIBIT <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.