Laserfiche WebLink
y • . <br />flumes/meters, water quality monitoring, and operation and maintenance costs <br />(e.g., electrical power costs, etc.). The objectives of demonstration projects are <br />educational and the delivery of water to prove feasibility thereby promoting a <br />long-term agreement between interested parties on operational costs and use of <br />recharge credits. <br />TASK 4- Establish Process for Lonq-term Aqreements and Fundinq <br />Through the process of completing Tasks 1 through 3, participants and others <br />may desire to pursue certain projects on a long-term basis. Participants may <br />desire to fund and build options themselves or in cooperation with others. The <br />Low Interest Loan Program of the CWCB's Water Project Construction Fund is a <br />viable process for long-term funding. The feasibility study and application <br />process for a CWCB loan is streamlined for potential projects because Tasks 1 <br />through 3 have accomplished much of what is required. An objective of this <br />lower South Platte River investigation is to have a process in place that new <br />projects and ideas can be "plugged into" and carried easily and efficiently <br />through funding and construction. <br />TASK 5- Preparation of reports <br />Annual progress reports will be prepared by the South Platte Lower River Group <br />so that CWCB, the Special Water Committee assembled in compliance with <br />Section 3 of Senate Bill 96-074 and others can see methodology and <br />accomplishments. These reports will include hydrologic analysis conducted <br />during Task 1. Any GIS databases developed during Task 1 will be available to <br />the CWCB. The matrix discussed in Task 2 will be included along with reports <br />on specific site investigations and demonstrations. <br />,}i1€g/mswrd/Lsecd/splrg.doc <br />`� � <br />