My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153735 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153735 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 8:38:47 AM
Creation date
7/2/2010 1:14:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153735
Contractor Name
South Platte Lower River Group
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
y • . <br />flumes/meters, water quality monitoring, and operation and maintenance costs <br />(e.g., electrical power costs, etc.). The objectives of demonstration projects are <br />educational and the delivery of water to prove feasibility thereby promoting a <br />long-term agreement between interested parties on operational costs and use of <br />recharge credits. <br />TASK 4- Establish Process for Lonq-term Aqreements and Fundinq <br />Through the process of completing Tasks 1 through 3, participants and others <br />may desire to pursue certain projects on a long-term basis. Participants may <br />desire to fund and build options themselves or in cooperation with others. The <br />Low Interest Loan Program of the CWCB's Water Project Construction Fund is a <br />viable process for long-term funding. The feasibility study and application <br />process for a CWCB loan is streamlined for potential projects because Tasks 1 <br />through 3 have accomplished much of what is required. An objective of this <br />lower South Platte River investigation is to have a process in place that new <br />projects and ideas can be "plugged into" and carried easily and efficiently <br />through funding and construction. <br />TASK 5- Preparation of reports <br />Annual progress reports will be prepared by the South Platte Lower River Group <br />so that CWCB, the Special Water Committee assembled in compliance with <br />Section 3 of Senate Bill 96-074 and others can see methodology and <br />accomplishments. These reports will include hydrologic analysis conducted <br />during Task 1. Any GIS databases developed during Task 1 will be available to <br />the CWCB. The matrix discussed in Task 2 will be included along with reports <br />on specific site investigations and demonstrations. <br />,}i1€g/mswrd/Lsecd/splrg.doc <br />`� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.