My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150204 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150204 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 9:49:09 AM
Creation date
7/2/2010 1:02:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150204
Contractor Name
Southeast Colorado Resource Conservation & Development, Inc.
Contract Type
Grant
Bill Number
SB 05-084
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARKANSAS VALLEY DRAINAGE STUDY <br />PROJECT SCHEDULE <br />The following table provides a brief description of the tasks with the revised sequencing�and commencement and completion dates. <br />TASK <br />DESCRIPTION <br />Phase 1 (first 18 months� <br />Commence <br />Complete <br />Task 1— Conduct initial hydrology study on the effects of local flooding from agricultural draina�Te systems <br />Task 2— Inventory and develop GPS/GIS base map of drainage systems. <br />Task 3— Identify, prepare and monitor beta drainage system (demonstration site). <br />Task 4— Clean out beta drainage system (demonstration site). <br />Task 5— Conduct study tour for local drainage district board members. <br />Task 6— Explore formation of consolidated drainage authority for the 25-plus drainage districts in area. <br />Task 7— Numerically code all tile/surface drains into a consolidated multi-county maintenance s��readsheet. <br />Task 8— Determine need for expanding the existing drainage system. <br />Phase 2 final six month� <br />11/1/2004 <br />11/1/2004 <br />4/1/2005 <br />10/ 1 /2005 <br />12/ 10/2005 <br />10/ 1 /2005 <br />1/i/2006 <br />7/1/2005 <br />3/ 1 /2005 <br />12/30/2006 <br />7/30/2005 <br />11 / 1 /2005 <br />12/15/2005 <br />6/30/2006 <br />12/31 /2006 <br />4/30/2007 <br />Task 1— Conduct benefit/cost analysis of drainage system rehabilitation. 7/1/2006 12/30/2006 <br />Task 2— Conceptualize rehabilitation and annual O& M costs under three scenarios. 1/1/2007 4/31/2007 <br />Task 3— Submit final report at end of Year 2. 6/30/2007 <br />Task 4— Submit supplemental report on beta site monitoring at the end of Year 3. 6/30/2008 <br />