My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150050 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150050 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 8:24:18 AM
Creation date
7/2/2010 12:22:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150050
Contractor Name
Mesa County Board of County Commissioners
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� � <br />reach-by-reach basis. <br />e. A summary of preliminary data obta.ined from COUNTY, LOCAL <br />SPONSORS, and others. <br />£ Acknowledgment of preliminary storm drainage criteria, data, and other <br />information obtained from COLTNTY, LOCAL SPONSORS, U.S. Aimy <br />Corps of Engineers, U.S. Geological Survey, Natural Resources <br />Conservation Service Colorado Department of Natural Resources <br />(CWCB, State Engineer and others), Colorado Department of <br />Transportation, Colorado Water Quality Control Division, BUREC, <br />Canal operators, utility companies, railroads, and others. <br />g. Summary of findings. <br />h. Pertinent charts graphs and material utilized. <br />i. A brief explanaxion of the benefit-cost analysis, including life and interest <br />rates used. Explain which indirect and/or intangible benefits were <br />considered and how dollar values were assigned. Also, apart from the <br />report furnished to COLTNTY, one (1) copy of the cost-benefit calculation. <br />These calculations shall be in tabular form, clear, legible and identified by <br />the reach on the stream. The tabulations, as a minimum, shall contain the <br />amounts of damages and reduction in damages to residences, commerc: �.i <br />buildings, roads, schools, utilities, and other development classifications <br />as appropriate, and will also identify the amounts allocated to tangible and <br />intangible d and for the damages to the contents of structures. A <br />brief written explanation of the calculations may be required by <br />COLTNTY if they are not self-explanatory. <br />j. A list and discussion of problem azeas as disclosed by hydrological and <br />hvdraulic calculations for each flood retum frequency. <br />k. A summary of costs associated with the best alternate plans by reaches <br />and divided into 1) drainage improvement costs; 2) street crossing costs; <br />3) utility relocations; 4) right-of-way costs; 5) contingency costs; and 6) <br />present worth of maintenance and other annual costs. Include <br />representative present day unit costs and percentage of contingencies <br />utilized. <br />l. A brief explanation of the soil and rationale for recommendations relative <br />to special needs, if any, for trea.hnent of channel side slopes, channel base, <br />
The URL can be used to link to this page
Your browser does not support the video tag.