My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150050 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150050 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 8:24:18 AM
Creation date
7/2/2010 12:22:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150050
Contractor Name
Mesa County Board of County Commissioners
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� ' � � <br />qualitative evaluation and shall use information developed by COLJNTY and the <br />responsible state and federal a.gencies to ma�mum extent practicable. <br />2.A.12. ENGINEER sha11 conduct a benefit/cost analysis using "Methodology for <br />Evaluation of Feasibility: Multi jurisdictional Urban Drainage and Flood <br />Control Projects" . The analysis at the minimum shall consist of the following: <br />a. The completion of a damage potential estimate for the total Drainageway <br />based on flows for future watershed development for the �-, 10-, 2�- and <br />100-vear storm events. <br />b. The consideration of total damages which includes both tangible and <br />intangible dama.ges. <br />c. The determination of the present worth of total damages over the study <br />reach based on interest ra.tes and project life as set forth in the reference <br />cited in above. <br />d. Consultation and decision on legal matters (provided by COUNT'Y). <br />e_ Determination of required right-of-way. <br />f. The evaluation and comparison of project benefits and costs, including <br />maintenance, on a reach basis and for the total study area for the best <br />altemate plans. The project benefits will include the reduction in damage <br />potential resulting from improvez.:_ent made, as well as u,direct or <br />intangible benefits where possible. <br />2.A.13. ENGINEER shall prepare a written report which will include, but not be <br />limited to, the following: <br />a. A brief statement to clarify ENGINEER's understanding of the agreement <br />and any action taken by the entities involved that modified, limited or <br />expanded such understanding. <br />b. A map depicting the drainage watershed, sub-watersheds, channel by <br />reaches, typical channel cross-sections, and jurisdictions involved. ' <br />c. Maps at a minimum scale of 1:�000, or another scale approved by <br />COLTNTY, schematically and clearly depicting the best alternative plans <br />developed for consideration, and showing the extent of flooding for the <br />100-year flows based on future watershed development conditions for the <br />best alternate plans for the 5-, 10-, 25- and 100-year altematives, as <br />appropnate. <br />d. A written description clearly describing the best alternative plans on a <br />
The URL can be used to link to this page
Your browser does not support the video tag.