Laserfiche WebLink
. ,,� <br />� <br />��� ������ <br />FEB 1 �. 2005 <br />COLORt:DQ RIVER l�►kTER <br />GG!�y�EP.`�PTfO�# D1S�fCT <br />DEPARTA�NT OF THE pRIqY PERMIT <br />Permittee: <br />Colorado River Water <br />Conservation District <br />201 Centennial Street <br />Post Offfce Box 1120 <br />Glerx,wod Springs. Colorado 81602 <br />Permit Number: 200375136 <br />Issuing Office: U.S. Army Engineer District. Sacramento <br />Corps of Engineers <br />1325 "J" Street <br />Sacramento. California 95814-2922 <br />NOTE: The term "you" and its derivatives, as used in this permit, means Lhe <br />transferee. The term "this office" refers to the appropriate district or divis on of the Corps of <br />Engineers having jurisdiction over the permitted activity or the appropriate officiai of that office acting <br />under the authority of the crnmanding officer. <br />You are authorized to perforn work in accordance with the terms and conditions sPecified below. <br />Project Description: This permit authorizes a raise in the base operationaT elevation of Elkhead Reservoir <br />bY 2D feet, which would increase the total reservoir capacity from approximately 13,700 acre-feet (AF) to <br />approximately 24,877 AF, The surface area of the new and full reservoir poo) would increase fran <br />approximately 435 acres to approximately 720 acres. <br />To:. Discharge approximately 451.000 cubic yards (GY) of earth fill and approximately 11,000 cubic yards of <br />concrete for dam and spillway construction, and approximately 50.000 CY of earth fill for temporary access <br />raising of County Road 29. This project will result in the iill or inundation of approximately 37.0 acres <br />of wetland at the margins and delta of the reservoir, a�_the base-oi the-existfflg dam and <br />. adjacent to �ount R�rad 29 embank�nt. a11 ofwhich she}1 be mitigated. <br />All ivork is to be completed in accordance with the attached plan(s). <br />Project Location: Approximately 9.0 miles northeast of the City of Craig withtn Section 16. Township 7 <br />North, Range 89 West, hbffat Coimty, Co)orado, at Elkhead Dam and Reservoir on Elkhead Creek, reference <br />Ralph White Lake, t1SG5 Topographic Quadrangle. <br />Permit Conditions: <br />General Conditions: <br />1. The time limit for carq�letinq the work authorized ends on February 1�. 2010. If you find that y� need <br />more time to complete the authorized activity; submit your request for a time extension to this office for <br />consideration at least 40 days before the above date is reached. <br />terms and cond ofhthistp�e�rmita�Youiare not if you aban t he permitted <br />activity, although.you may make a good faith transfer to a third party in comptiance with General Condition <br />4 below. Should you wish to cease to maintain the authorized actfvity or should you desire to abandon it <br />without a 9ood faith transfer, you �ast obtain a modification of this permit from this office, which may <br />require restoration of the area. <br />