My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150227 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150227 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2011 1:22:31 PM
Creation date
6/29/2010 3:32:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150227
Contractor Name
South Platte Ditch Company
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />Project Schedule <br />Revised February 2010 <br />Exhibit 1 to Grant Contract C150227 Amendment No. 1 <br />List of yet-to-be completed tasks: <br />Install radio/control units on 2nd group of J&E Wells <br />Build overshot gate for upper spillway <br />Install radio/control unit @ SPDC river diversion & automate gates <br />Install radio/control unit on river dam for set target flow rates <br />Install radio/control unit on SPDC lower canal - Smart site <br />Program and install alarm system for automated sites <br />Link radio/control unit at SPDC upper flume to Kautz lift pump <br />Install radio/control units on Company Lateral lower flume <br />Install weir blades at Sandhill recharge pond <br />Install radio/control unit on Kautz recharge site <br />Install radio/control unit on Lingreen Recharge site <br />Install radio/control unit on Hettinger-Bollers recharge site <br />Install radio/control unit on site near Julesburg to be designated by DWR <br />Install radio/control unit at J&E Office <br />Install long throated flume on Smith #3 recharge site <br />Build and install measurement structure in main canal near Co Lateral diversion <br />Install radio/control units on J&E diversion if determined warranted by DWR <br />Start <br />4/1 /2010 <br />4/1 /2010 <br />4/1 /2010 <br />5/1 /2010 <br />4/15/2010 <br />4/1 /2010 <br />4/1 /2010 <br />6/1 /2010 <br />8/1 /2010 <br />5/30/2011 <br />5/30/2011 <br />5/30/2011 <br />4/1 /2010 <br />3/1 /2011 <br />6/1 /2011 <br />11/1/2010 <br />4/1 /2010 <br />Complete <br />7/15/2010 <br />7/15/2010 <br />8/15/2010 <br />6/30/2012 <br />6/30/2011 <br />4/12/2012 <br />6/15/2010 <br />9/30/2011 <br />10/15/2010 <br />9/30/2011 <br />9/30/2011 <br />9/30/2011 <br />11 /30/2011 <br />4/12/2012 <br />10/15/2011 <br />3/1 /2012 <br />6/30/2012 <br />�T1 <br />� <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.