My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150216 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150216 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 8:53:38 AM
Creation date
6/29/2010 2:17:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150216
Contractor Name
Republican River Water Conservation District
Contract Type
Grant
Water District
0
County
Lincoln
Logan
Sedgwick
Washington
Yuma
Phillips
Kit Carson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• RRWCD CompacC Compliarnx Pipeline <br />Scope of W�k <br />August 30, 2007 <br />Study Schedule - As shown on Figure l, the final report will be completed by the end of 2007 <br />assuming that we receive timely inputs from the District, its water rights and legal advisors, and <br />DWR. The required timing of these inpats is also depicted on Figure 1. <br />Figure 1— RRWCD Compact Compliance Pipeline Study Schedule <br />Task <br />Dec. 2007 <br />1. Review of Information A <br />2. Formulation of Altematives <br />3. Confirmation of Aitematives <br />4. Evaluation of Altematives <br />5. Impiementation Plan <br />6. Presentation of Findings � � <br />7. DocumentatioR in Report <br />Inputs required from District, District advisors, and DWR. A- Basic project infortnation is provided a <br />Distriet water censultant B- Basic conceots are reviewed and inDUts Drovided to GEI; C-�oard me <br />ind explained by <br />nbers provide input <br />on initial findings; D- Report comments provided by reviewers. <br />Cost by Task — The estimated breakdown of study cost by task is provided below: <br />Task 't : Review of Informatian <br />Task 2: Fortnulation of Aftematives <br />Task 3: Confirmation of Altematives <br />Task 4: Evaluation of Altematives <br />Task 5: Implementation Plan <br />Task 6: Presentation of Findings <br />Task 7: Documentation <br />TOTAL <br />$3,692 <br />$8,581 <br />$4.826 <br />$12,036 <br />$7,019 <br />$6,677 <br />7 169 <br />$50,000 <br />Bvdget details are provided on the following spreadsheet; however, the allocations by task will <br />change during the course of the study and the contract will not be managed by task. The allotted <br />budget for this study is sufficient to complete a feasibility study as described in this proposal, but <br />dces not compare in scope to a feasbility study according to Colorado Water Conservateon Board <br />(CWCB) guidelines. More detailed planning studies will likely be appropriate and recommended <br />as this project is developed in more specificity and detail. <br />� � <br />GEI � <br />
The URL can be used to link to this page
Your browser does not support the video tag.