Laserfiche WebLink
resources." Id. <br />Ultimately, Forest Supervisor Underwood issued a Record of Decision (ROD) which <br />granted WSSC a land use authorization for the reservoir including the revised JOP as a <br />mitigation measure. (AR -LD at 4581- 4607.) The ROD included an amendment to the Forest <br />Plan to exempt Long Draw from Forest Plan requirements. (Amendment No. 20a, AR -LD at <br />4615.) In disregarding the comments urging the adoption of Alternative C, Supervisor <br />Underwood stated that he reached his decision only after "considerable consultation, <br />deliberation, and reflection upon the proper balance of multiple uses of Federal lands and the <br />appropriate environmental mitigation ...." (AR -LD at 4599.) Six months after the ROD was <br />issued, the Forest Service executed a fifty -year water facility easement to WSSC for the use and <br />operation of the Long Draw Dam and Reservoir expansion area. (AR -LD at 4898 - 4907.) <br />Plaintiffs challenge these actions. <br />Plaintiffs' Complaint alleges the following claims for relief: (1) Violation of FLPMA § <br />505; (2) Violation of National Environmental Policy Act (NEPA) in failing to consider all <br />reasonable alternatives; (3) Violation of NEPA in failing to include all necessary information in <br />the EIS; (4) Violation of NEPA in failing to prepare a supplemental EIS discussing the grant of <br />an easement; (5) Violation of NEPA in failing to prepare a supplemental EIS evaluating the <br />Forest Plan amendment with sufficient particularity; (6) Violation of NEPA in failing to prepare <br />a supplemental EIS evaluating the May 18, 1994 JOP; (7) Violation of the Forest and Rangeland <br />Renewable Resources Planning Act (FRRRPA) in exempting certain facilities from substantive <br />requirements of the Forest Plan; (8) Violation of FRRRPA in failing to ensure that authorization <br />for use of National Forest system lands be consistent with the Forest Plan; (9) Violation of <br />-6- <br />