My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Town, Army Corps on Crash Course Over River Work
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Town, Army Corps on Crash Course Over River Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2010 10:17:38 AM
Creation date
6/22/2010 9:06:05 AM
Metadata
Fields
Template:
Water Supply Protection
Description
RICD News Articles
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
9/8/2005
Author
James Robinson, The Pagosa Sun
Title
Town, Army Corps on Crash Course Over River Work
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Searchable Databases <br />Page 2 of 9 <br />Town Manager Mark Garcia said, "I concur with you Mayor Aragon, I feel we're kind of getting bullied <br />on this," Garcia said. <br />Aragon said he advocated seeking legal counsel and Garcia said he would pursue that course. <br />Phase II of the town's river project encompasses a stretch of river between the Hot Springs Boulevard <br />bridge and the Apache Street bridge. <br />The project, as currently proposed would consist of replacing the previously installed "W" shaped in- <br />stream structures with "U" shaped structures. The "U" structures will provide recreational opportunities <br />for whitewater enthusiasts and are said to increase and improve fish habitat. According to the town's <br />plan, the "U" shaped structures will be an improvement over the "W" structures. Beyond the installation <br />of the structures, the project would include river bank stabilization and revegetation. <br />According to the U.S. Army Corps of Engineers document, there are numerous items in the town's <br />application at issue. <br />First, the document states the town has not provided sufficient scientific or logical data on the function <br />and placement of the proposed "U" structures. Nor had alternative placements designs, and rationale for <br />and against those been presented. <br />The corps document also expresses concern regarding a U- shaped structure that the town installed <br />downstream from the Hot Springs Boulevard bridge in March 2005. The corps document calls it an <br />unauthorized structure and says the structure had raised the flood stage level in the river by 1,000 cubic <br />feet per second and has caused an increase in sediment levels behind the structure and could have <br />negative impacts on water quality. In addition, the corps says the town failed to provide data on <br />preconstruction and post construction river conditions related to the March 2005 installation. <br />The document states, "...the office has determined that the construction completed in the spring of 2005 <br />has greater than minimal adverse impacts to the aquatic environment and does not meet the requirements <br />of Section 404 (b)(1) guidelines. You are therefore required to remove the structures, which include the <br />bank stabilization work, modified deflectors and the "U" structures, and restore the site to its <br />preconstruction contours ... or modify the project so that it meets our program requirements." Other key <br />issues cited in the corps' document is that the town plan lacks sufficient hydraulic information such as <br />100 -year flow, average width of the floodplain and active channel, average stream velocity and expected <br />changes to these conditions once the plan is completed. <br />The corps charges the town with failure to address a key component of its own proposal, that being the <br />improvement of aquatic characteristics throughout the project area. The corps says the town plan like <br />biological data, species inventories and an analysis of the riparian corridor that could be affected by the <br />proj ect. <br />"This office is concerned that the use of grout and hard bank stabilization will reduce the quality of <br />aquatic habitat rather than enhance it," the document states. <br />Part of the town plan includes anchoring the in- stream structures with grout and this has proved <br />contentious. <br />Some biologists argue that grout eliminates interstitial habitat for insect species upon which trout and <br />other fish species rely for food. <br />http:/ /www.pagosasun.com/frontpage.htm 9/15/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.