My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Upper Gunnison River Water Conservancy District Regular Board Meeting Minutes (4)
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Upper Gunnison River Water Conservancy District Regular Board Meeting Minutes (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2010 2:41:56 PM
Creation date
6/15/2010 12:50:53 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Gunnison Meetings, Minutes, Supporting Documents
State
CO
Basin
Gunnison
Water Division
4
Date
3/25/2002
Author
Upper Gunnison River Water Conservancy District, Bob Drexel, Gregory N. Peterson, John H. McClow, Gregory N. Peterson
Title
Upper Gunnison River Water Conservancy District Regular Board Meeting Minutes
Water Supply Pro - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dennis Steckel moved approval of operational expenses paid. Diane Lothamer <br />seconded the motion. The motion carried. <br />12. CONSIDERATION OF OPERATIONAL AND OTHER EXPENSES PAYABLE <br />Diane Lothamer recommended approving $3915.58 of the Alperstein & Covell bill, <br />pending investigation of the balance forward figure. <br />Diane Lothamer moved approval of operational and other expenses payable as <br />listed, amending Alperstein & Covell' s bill to $3915.58. Dennis Steckel <br />seconded. The motion carried. <br />13. MONTHLY BUDGET REPORT <br />Diane Lothamer said that the percentages in the monthly budget summary are on <br />track, and that the board will need to amend the budget at some future point. <br />14. FUTURE MEETINGS <br />The board will adopt election resolutions on April 10 at noon in the District' s <br />office. The next worksession on the Water Management Plan is scheduled for April <br />17 at 4:30 p.m. at the Multipurpose Building. The next regular board meeting will <br />take place on April 22 at 7:00 p.m. at the Multipurpose Building <br />Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.