My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Round Mountain Water System Improvement Project_Contract & Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Round Mountain Water System Improvement Project_Contract & Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2013 4:39:42 PM
Creation date
6/14/2010 2:26:12 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Arkansas
Applicant
Round Mountain Water and Sanitation District
Description
Round Mountain Water and Sanitation District Water System Improvement Project
Account Source
Basin
Board Meeting Date
5/22/2007
Contract/PO #
150403
WSRF - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUMMARY OF TASKS: <br />The $120,000.00 WSRA (Arkansas Basin) Grant will be used to fund the following tasks <br />associated with the proj ect (drilling a new water supply well with a new pump, electrical supply, <br />treatment building and equipment, and chlorine contact chamber): <br />1.0 Well Permit <br />2.0 Water Quality Testing <br />a. 208.8 Drinking Water <br />b. 300.0 Anions (Nitrate and Nitrite) <br />c. 504.1 Standard DW List <br />d. 508 Standard DW List <br />e. 515.4 Standard DW List <br />f. 524.2 Standard Drinking Water List <br />g. 525.2 Standard Drinking Water List <br />h. 5.31 Carbamaics <br />i. 547 Glyphosate <br />j. 548.1 Standard Drinking Water List <br />k. 549 Diquest <br />1. Floride <br />m. Gross Alpha and Beta <br />n. Langelier Index <br />o. Radium 226/228 <br />p. Radon <br />q. Total Cyanide <br />3.0 Production Well—Drill, Case and Grout <br />4.0 Pump and Controller <br />a. Install Well Pump <br />b. Install Internal Well Piping <br />c. Cap Well <br />d. Well Pump Controller <br />5.0 Aquilla 3- Phase Power to Gallery Site <br />a. Install 1510 feet of overhead 3-Phase power with 9 poles <br />b. 900 feet of underground 3-phase power <br />6.0 Contact Chamber <br />a. Pipe & Other Materials <br />b. Excavation <br />c. Pipe installation & testing <br />7.0 Water Treatment Building <br />a. Foundation <br />b. Framing, Roofing, Doors & Windows <br />c. Insulation <br />d. Heating <br />e. Venting <br />
The URL can be used to link to this page
Your browser does not support the video tag.