My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Round Mountain Water System Improvement Project_Contract & Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Round Mountain Water System Improvement Project_Contract & Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2013 4:39:42 PM
Creation date
6/14/2010 2:26:12 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Arkansas
Applicant
Round Mountain Water and Sanitation District
Description
Round Mountain Water and Sanitation District Water System Improvement Project
Account Source
Basin
Board Meeting Date
5/22/2007
Contract/PO #
150403
WSRF - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
chlorine contact chamber. In addition, the District will install a new water distribution main from <br />the well site to the existing system which will create a new water pressure zone in Silver Cliff <br />with a variable frequency booster pump station, and a generator back up and electrical supply, <br />add new water line looping and finally, purchase and install an additional water storage tank. <br />Due to the extensive costs to complete this project and limited funding ability of the District, <br />RMWSD will accomplish these goals in two phases. The Phase 1 will include the new well, <br />including electrical supply, treatment building and equipment, chlorine contact chamber, <br />distribution main, booster pump station, back up generator and some looping. Phase 2 will <br />include the purchase and installation of additional water storage tank, distribution main and <br />additional mains and looping. <br />Following is a description of the goals of this project and how and when they will be <br />accomplished: <br />1. Increase water system production capacity by 250 gpm. <br />a. Drill new production well at Gallery Site. <br />b. Test water production & water quality. <br />c. Insta113-phase power & production well pump. <br />2. Design treatment system and obtain CDPHE system approval. <br />3. Install new treatment capacity ready for connection to distribution system. <br />a. Treahnent building. <br />b. Chlorine gas treatment system. <br />c. Chlorine contact chamber. <br />
The URL can be used to link to this page
Your browser does not support the video tag.