SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br />1. Board approval of engineering Pirm and engineering <br />agreement between engineering firrt� and profect sponsor. <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulttn� engineering firm. <br />3. Approval of detalled plans ar.� specifications by Board <br />stafP (plans and speciflcations for storage dams and <br />reservolrs must also be approv�d by State Engineer's <br />' office). <br />4. Baard staPf approval oP bldding for the project. Board <br />stafP present at bId opening for construction. <br />5. Pro�ect sponsor may Lssue the ce of award and the <br />notice to proceed with � to the contractor <br />(both notices must be ap r the Board staff bePore <br />they are Iss�ed). <br />6. Conduct a pre-constru t �i�� Approval of <br />construction schedule�oard staff. <br />7. Constructlon commences. The Board staPf makes periodic <br />inspections during construction. AL1 change orders must <br />be approved by the Board staPf in advance and before any <br />constructlon on change items can commence. Emergency <br />items cleared by telephone. <br />8. The consulting engineer certifies that the profect has <br />been completed according to approved drawings and <br />speclfications and arranges for final inspection. <br />9. Final Inspectlon and acceptance of as-built pro�ect by <br />Board staff. <br />10. Submittal of as-built drawings to Board staff f�or <br />approval and Piling. <br />