My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposed Trial Management Order
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Proposed Trial Management Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 1:36:07 PM
Creation date
6/9/2010 11:46:41 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Gunnison RICD
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/2003
Author
Cynthia F. Covell, Gilbert Y. Marchand, Jr., J. Steven Patrick
Title
Proposed Trial Management Order
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Upper Gunnison River Water Conservancy District <br />Case No. 02CW038, District Court, Water Division No. 4 <br />B. The claimed water rights are located approximately 150 miles upstream of the state <br />line. <br />C. The reach of the claimed water rights extends approximately one - quarter mile within <br />the channel of the Gunnison River. <br />D. The nature of the activities for which the .claimed water rights are sought is boating, <br />rafting, tubing, kayaking, and other recreational boating activities. <br />E. The reach of the Gunnison River in which the structures known as Structures 2 -6 are <br />located is an appropriate reach of stream for the intended use. <br />F. At a flow rate of 250 cfs, the claimed wafer rights will divert, capture, and control <br />water in its natural course and location, if the structures known as Structures 2 -6 are <br />built and maintained as designed. <br />III. PRETRIAL MOTIONS. <br />The following pre -trial motions are pending or may be filed: <br />A. Motionto SupplementCWCB's Objectors' Disclosure Pursuant to C.R.C.P. 26(a)(2) <br />and 26(e) (filed on July 29, 2003; response consenting to motion filed on August 13, <br />2003). <br />B. Expedited Motion for Continuance (filed on August 12, 2003; denied August 14, <br />2003, with leave to renew at trial management conference on August 22, 2003). <br />C. Applicant's Motion Requesting Court to View in Person the District's Whitewater <br />Park (filed August 11, 2003). <br />D. Applicant's Motion for Extension of Deadline to Complete Discovery and Extension <br />of Deadline to Exchange Draft Witness and Exhibit Lists (filed on August 13, 2003). <br />IV. TRIAL BRIEFS. <br />The actively participating parties may file trial briefs no later than ten days before trial (on <br />or before September 5, 2003.) <br />V. ITEMIZATION OF DAMAGES OR OTHER RELIEF SOUGHT. <br />Not applicable as to damages. Applicant seeks a decree confirming the conditional <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.