My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOA Southeastern Colorado Water Activity Enterprise and City of Florence
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
MOA Southeastern Colorado Water Activity Enterprise and City of Florence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 9:03:24 AM
Creation date
6/3/2010 11:32:28 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Pueblo and Torquoise Reservoirs
State
CO
Basin
Arkansas
Water Division
2
Date
11/5/2001
Author
Southeastern Colorado Water Activity Enterprise, City of Florence, Steve Arveschoug, Eugene Roeder
Title
MOA Southeastern Colorado Water Activity Enterprise and City of Florence
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENLARGEMENTS MOA <br /> WEST OF PUEBLO <br /> d. Participant shall participate in a long -term water quality monitoring <br /> program as outlined in the Implementation Committee Report. <br /> The financial obligations for such participation are expected to <br /> • begin in January 2002 (prior to execution of a Enlargement <br /> Allotment Contract), pursuant to a joint funding agreement <br /> between the Enterprise and the United States Geological Survey <br /> ( "USGS "). The long -term water quality monitoring program costs <br /> for Enlargements are estimated to be $ fd 00 D • for each • <br /> • year beginning in 2002. While this estimate illustrates the • • <br /> expected range of magnitude of costs, Participant's obligations <br /> pursuant to this MOA are based on actual costs incurred, rather <br /> than estimates. <br /> e. Any new uses of the south outletworks at Pueblo Dam shall assure <br /> that capacity for the Arkansas Valley Conduit is not compromised. <br /> The Pueblo Dam south outlet works capacity is 359 cfs, which <br /> includes 30.94 cfs for the Arkansas Valley Conduit, 278.50 cfs for <br /> the Pueblo, Board of Water Works, 30.60 cfs for the Fountain <br /> -15- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.