My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOA Southeastern Colorado Water Activity Enterprise and Crowley County
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
MOA Southeastern Colorado Water Activity Enterprise and Crowley County
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 9:03:24 AM
Creation date
6/3/2010 11:09:02 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Pueblo and Torquoise Reservoirs
State
CO
Basin
Arkansas
Water Division
2
Date
11/30/2001
Author
Southeastern Colorado Water Activity Enterprise, Crowley County, Steve Arveschoug
Title
MOA Southeastern Colorado Water Activity Enterprise and Crowley County
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> ENLARGEMENTS MOA <br /> GENERAL <br /> MOA; such other participants, together with Participant, are referred to herein as <br /> the "Enlargements Participants." <br /> B. As set forth in the PSOP Report, implementation of the Enlargements is intended <br /> to result in construction of both the Pueblo Reservoir Enlargement and the <br /> Turquoise Reservoir Enlargement. Because Pueblo Reservoir and Turquoise <br /> Reservoir are owned by the United States as part of the Fryingpan- Arkansas <br /> Project, it appears likely that such construction will require authorization by an act <br /> of Congress (the "Enlargement Authorizing Legislation "), following a federal <br /> feasibility study. The Enterprise intends, after enactment of the Enlargement <br /> Authorizing Legislation, to enter into a master contract with the United States for <br /> construction and use of one or both ofthe Enlargements, and then to enter into <br /> allotment contracts with Enlargement Participants, as discussed in the <br /> Implementation Committee Report, for construction financing and allocation of <br /> storage in the Pueblo Reservoir Enlargement and/or Turquoise Reservoir <br /> Enlargement. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.