My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibits 1-6 for Case 02CW038
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Exhibits 1-6 for Case 02CW038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 9:03:17 AM
Creation date
5/21/2010 2:19:37 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Gunnison RICD
State
CO
Basin
Gunnison
Water Division
4
Date
7/17/2002
Title
Exhibits 1-6 for Case 02CW038
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Platte River at Union Avenue. This assignment included performance of <br />alternatives evaluation, design, and obtaining approvals from many jurisdictions. <br />South Platte River Master Plan, Urban Drainage District, 1983. This project included <br />resource inventory, soliciting input from various agencies, interest groups, municipalities, <br />and citizens; formulating plans and preliminary designs for parks, natural areas, bike and <br />pedestrian paths, access points, river improvements, and fish- wildlife habitat <br />improvements; producing cost estimates for each phase; recommendations for <br />maintenance programs; and conducting public presentations for the project. <br />Miscellaneous Boat Chutes, Denver, Colorado, 1983 -1987. Designed and model - tested <br />safety improvements installed in the Platte River -3rd Avenue Dam boating bypass <br />structures. <br />Whitewater design engineer for boating bypass projects including the Arkansas River at <br />Buena Vista, Colorado, and the South Platte River at Florida Avenue, the South Platte <br />River at Oxford Avenue, the South Platte River near Gates Rubber Company, and Bear <br />Creek at Sheridan Boulevard in Denver, Colorado. <br />1991 -1998 Boulder Greenways Coordinator <br />City of Boulder <br />Boulder, Colorado <br />Responsible for planning, coordination, management, and implementation of a <br />comprehensive, state -of- the -art greenway system designed to link virtually every major <br />area of Boulder. The award winning project includes over forty miles of greenways, <br />bridges and underpasses, pocket parks, environmental presentation and restoration areas, <br />and flood capacity improvements. The project budget is over $1 million each year. <br />Reference: Dick Brasher <br />City of Boulder, Transportation Department <br />1987 -1989 Special Projects Manager <br />City of Boulder <br />Boulder, Colorado <br />Responsible for planning, coordinating and managing a number of City projects along <br />with providing guidance and input for the preparation of city -wide master plans, annual <br />operating and capital budgets. and determination of recommended city policies. Worked <br />closely with the City Manager's office, City Attorney's office and the Parks, Planning, <br />Open Space, and Public Works Departments in a cooperative way to complete each <br />project. Received the 1988 Boulder Employee Performance Bonus Award. The <br />following are some representative projects: <br />Accomplishments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.