Laserfiche WebLink
• The estimated cost of the completed project is $167,500.00. The cost breakdown is <br />summarized in the table 1. <br />IMPLEMENTATION SCHEDULE <br />Work began on this project in late August of 2006 and is scheduled to be completed in <br />October of 2006. <br />u <br />PERMITTING <br />Lazy O Ranch Homeowners' Association has been granted the necessary water rights <br />from the State of Colorado Water Division to divert the water need to supply the pond, <br />case no 04CW 177, copy enclosed in this application, appendix E. The Ranch was also <br />granted the earth moving permit needed from Pitkin County. <br />ENTITIES INVOLVED <br />The following list represents the entities that have contributed or will contribute to the <br />design, construction, and financing of the project: <br />• Lazv O Ranch Homeowners' Association Inc — financing, project management <br />and revegetation <br />•�ris En ineerin�Inc — engineering design of project <br />• Jerrv's Irri�ation & Land Inc — construction of project <br />• Durgin Electric, Inc. — electrical contractor for pump house and pumps <br />• Samuelson Pump Co Inc — install and supply pump for pump house <br />• Community Banks of Colorado — financing <br />• • Colorado Water Conservation Board (CWCB� - financing <br />Lazy O Ranch Homeowners' Association, Inc. Page 8 of 10 <br />September 2006 <br />Table 1— Lazy O Ranch Homeowners' Association <br />Irrigation System — Cost Estimate <br />