Laserfiche WebLink
1 <br />City of Boulder and <br />Colorado Water Conservation Board <br />Case No. 90CW193 <br />Page 21 <br />subparagraph A. above. The return flow obligation may be met by <br />either of the following methods: <br />1. Return flows from the treatment and direct use <br />of 38 acre -feet (36 acre -feet = .91. This .91 is the weighted <br />average municipal return flow factor for the period October <br />through March.) of such Windy Gap water in Boulder's municipal <br />water supply system during the months of October through March <br />shall be discharged to Boulder Creek at the outfall of <br />Boulder's present wastewater treatment plant near 75th Street. <br />2. In the alternative, Boulder shall retain <br />36 acre -feet of such Windy Gap water in storage in Boulder <br />Reservoir to be released to Boulder Creek through the Boulder <br />Supply Canal at times and at rates for delivery to water <br />rights (either directly or by exchange) as are requested by <br />State water administration officials. These releases shall be <br />made prior to the May 1 which follows the period of October <br />through March in which the return flow obligation was owed. <br />3. Boulder also proposes to use as a source of <br />water to meet the return flow obligation hereunder water <br />available to Boulder from any other source which is decreed <br />for replacement or augmentation or is legally permitted to be <br />reused and which can be provided in the amount, at the time <br />and at the location required hereunder. Prior to the use of <br />any such water, Boulder shall provide written notification to <br />State water administration officials and the opposers of the <br />source of the water to be used and how the water will be <br />delivered. <br />4.11 Boulder has specifically agreed that it forgoes any claim <br />to any portion of the outdoor use return flows accruing to Boulder <br />Creek from the municipal use of water rights used in its municipal <br />water supply system in place of the water rights used for instream <br />flow purposes under this decree; provided, however, that this <br />provision does not run with such water rights in the event of their <br />sale or transfer to other parties but instead shall only be a <br />limitation on Boulder's use of such water rights in its system. <br />4.12 Water left undiverted or released from storage hereunder <br />for instream flow• use by the Board shall not be available for <br />diversion and shall not be diverted by water users in the segment <br />in which the instream flow use is being made by the Board. Water <br />left undiverted or released from storage at a point or points <br />upstream of the upstream point of the segment in which the instream <br />flow use will be made by the Board shall likewise not be available <br />for or diverted by other water users. If necessary, the water <br />21 <br />