My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150303 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150303 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2011 8:47:07 AM
Creation date
2/26/2010 1:01:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150303
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Implementation Schedule <br />Davis Engineering Service, Inc. was contracted in June 2009 to prepare a design for the <br />repairs of the dam embankment, replacement of the sluice gate, extension of outlet pipe, <br />and to perform related field work. Their plans were submitted to the State Engineer's <br />Dam Safety Engineer for review and approval on August 7, 2009. <br />The reservoir was drained in early September 2009. The Trinchera Irrigation Company <br />began the removal of the riprap from the face of the dam. Gardner Excavating, Inc., the <br />general contractor, began the removal of silt, crushing riprap, and making necessary <br />preparations for reconstruction which would begin as soon as approval from the State <br />Engineer was received. <br />On November 2, 2009 approval of the design plans was received from Paul Perri, P.E. <br />with the State Engineer's Dam Safety Division. Reconstruction began immediately. <br />Photographs of the repairs and reconstruction are included in Appendix G. <br />The slope on the upstream side of the dam, replacement of the rip rap, and the outlet pipe <br />extension should be completed by the early December 2009. The sluice gate was ordered <br />from Waterman Industries and is scheduled to arrive in late December or early January <br />2010. It will be installed by Alcon Construction upon arrival. Appendix D contains the <br />design plans of the sluice gate. <br />Permitting <br />A Nationwide Permit No. 3 permit was issued September 29, 2009 by the Department of <br />the Army, Durango Regulatory Office, 799 East Third Street, Durango, CO. See <br />Appendix H for a copy of the permit. <br />Institutional Considerations <br />Entities that were, axe, or may be, involved in the design, construction, and financing of <br />the project include: <br />• Trinchera Irrigation Company: financing and project management <br />• Davis Engineering Service, Inc: design <br />• Gardner Excavating, Inc.: general contractor <br />• Alcon Construction, Inc.: concrete <br />• Colorado State Engineer's Dam Safety Division <br />• Colorado Water Conservation Board: financing <br />• Southway Construction Company, Inc.: bed rock <br />• Waterman Industries, Inc.: sluice valve <br />Financial Analysis <br />