My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150304 feas study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150304 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 3:13:51 PM
Creation date
2/24/2010 10:53:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-032
C150304
Contractor Name
Lower Latham Reservoir Company
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />8.2.2 Klein Recharge Site <br />A conceptual layout of the proposed improvements at the Klein Recharge site is shown in Figure 4. <br />The recharge reservoir area was calculated based on conversation with the existing farmer, <br />knowledge of the areas soils, and several site visits. This site information collected estimates that <br />sandy soils will be achieved at a depth of approximately 5 ft which will be approximately the <br />recharge pond bottom. The recharge rate was assumed to be similar to the Schmidt soil conditions of <br />2 cfs/acre for a minimal size of 6 acres. The ponds were oversized to 9 acres to allow any <br />sedimentation or erosion within the reservoirs which will decrease the recharge ability. The recharge <br />reservoirs will be constructed with side slopes of 3H: 1 V which is consistent with sandy site soils that <br />extend from the natural ground surface to the free draining soils located above the aquifer. To <br />protect against storm water a two foot high berm will be constructed surrounding the excavated <br />reservoir. The augmentation water to be delivered to the recharge reservoir is proposed to be <br />delivered using an existing headgate off of the Lower Latham Ditch. Approximately 2,8501ineal feet <br />� of the Klein Lateral will be concrete lined to facilitate future deliveries to the site. <br />- An EOPPC for the construction of the Klein Recharge site is shown in Table 4. It is noted that land <br />acquisition area included in the EOPPC is limited to that amount of area required for the recharge <br />ponds, sedimentation pond, and associated delivery and measurement structures. <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.