Laserfiche WebLink
only to provide a general financial planning number. As the design is only conceptual, final <br />construction costs will vary depending on final design elements, geotechnical (i.e. soils) conditions, <br />costs of raw materials, etcetera, many of which are subject to market conditions at the time of <br />construction. Accordingly a 20% contingency has been included in the budget to account for these <br />unknowns. <br />An EOPPC for the construction of the Schmidt Recharge site is shown in Table 3. It is noted that <br />land acquisition area included in the EOPPC is limited to that amount of area required for the <br />recharge ponds, sedimentation pond, and associated delivery and measurement structures. <br />-11- <br />