My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - San Antonio River El Codo Ditch Diversion Rehabilitation_Purchase Order & Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - San Antonio River El Codo Ditch Diversion Rehabilitation_Purchase Order & Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:17:44 AM
Creation date
1/21/2010 2:52:50 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Rio Grande
Applicant
El Codo Ditch Company
Description
San Antonio River-El Codo Ditch Diversion Rehabilitation
Account Source
Basin
Board Meeting Date
5/20/2009
Contract/PO #
10000000001
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 4, 2009 <br />Stabilizing flows of the San Antonio River, thus keeping all possible water within the Basin <br />Demonstrating the wise use of water resources to support the Basin's agricultural economy <br />Optimizing the natural hydrology of flood irrigation to replenish the Basin's aquifer <br />Promoting efficiencies which directly reduce Rio Grande Compact curtailments <br />Protecting from loss of Basin water which would otherwise bypass the Los Sauces gauge <br />Defending senior water rights of five generations of farmers who depend on surface irrigation <br />Improving agricultural profitability and discouraging the selling of water rights for financial gain <br />Preparing a historic ditch company to more adequately adapt to changing supply and demand <br />Giving needed operational flexibility so as to meet future uncertainties of water supply <br />Promoting in -basin storage and water quality <br />PHASE I - Spring, 2009 <br />TASK 1— Mobilization <br />Description of Task - Mobilize equipment and facilitate access to proposed job site. Clear <br />debris and obstacles in access -road approach to river and fill in ruts with gravel. <br />Mobilize 50 cu yds of rock from source location ten miles from project site in Antonito. Rock <br />meets specifications per NRCS engineering drawings for J -Hook installation. Quarry rock <br />donated by ditch shareholder. In -kind value = $35 /ton x 75 tons = $2,625 <br />Equipment - Excavator and Dump truck, 15 cu yd capacity <br />Method/Procedure — Mobilization shall include all activities and associated costs for <br />transportation of contractor's personnel, equipment, and operating supplies to the site following <br />NRCS specifications for mobilization and environmental guidelines. This work includes <br />mobilization required by the contract at the time of award. If additional mobilization activities <br />and costs are required during the performance of the contract as a result of changed, deleted, or <br />added items of work for which the contractor is entitled to an adjustment in contract price, <br />compensation for such costs will be included in the price adjustment for the item or items of <br />work changed or added. <br />Deliverable — This work was completed according to Phase I in Project proposal with no <br />additional mobilization activities or costs required. The roadway was cleared for equipment <br />access and the boulders and rocks were set in place ready for the next task. <br />TASK 2 — Shaping of River <br />Description of Task — Stabilize main channel flows in preparation for Phase II construction. <br />Equipment — Excavator <br />Method/Procedure — Restore integrity of main channel with excavator and redistribute material to <br />recreate natural channel flow. Reslope and stabilize bank. Fill in erosion point on SW corner of <br />riverbed. Install root wad structures for habitat. Temporarily clear streambed of obstructions and <br />debris in anticipation of future work. Clear gravel away from the diversion structures. Stabilize <br />streambanks and improve the condition of the riverbed sufficiently to minimize channel <br />movement until Phase 11 begins. Increase the depth -to -width ratio of the channel in anticipation <br />of high flows this spring and in preparation for construction in Phase 11. <br />El Codo Ditch Company 2 Updated Statement of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.