My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - La Plata Archuleta Water District Water System Master Planning_Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Southwest - La Plata Archuleta Water District Water System Master Planning_Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 11:58:23 AM
Creation date
1/21/2010 1:49:35 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
La Plata Archuleta Water District
Description
Water System Master Planning
Account Source
Basin
Board Meeting Date
11/18/2008
Contract/PO #
09000000112
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 • <br />Scope of Work <br />WATER ACTIVITY NAME — La Plata Archuleta Water District — Master Plan <br />GRANT RECIPIENT — La Plata Archuleta Water District <br />FUNDING SOURCE — Water Supply Reserve Account, Southwest Basin <br />INTRODUCTION AND BACKGROUND <br />The La Plata Archuleta Water District (District) is a special district organized pursuant to <br />Article 1 of Title 32, Colorado Revised Statutes. The District was formed by a majority vote <br />in an election held August 12, 2008. Five Board members were also elected on August 12 <br />and have been seated. <br />The District has been formed to finance, construct, operate and maintain a public water <br />distribution system in the southeast portion of La Plata County. The Project is the <br />preparation of a Master Plan, or Preliminary Engineering Report, for adoption by the <br />District's Board of Directors establishing its plans for the construction of a water <br />treatment plant and water distribution system to provide reliable and safe potable public <br />water and fire protection facilities. <br />The Southwest Basin Roundtable approved a $100,000 grant from Basin Funds for the <br />development of a Master Plan which was subsequently approved by the CWCB Board. <br />This is the scope of work for the grant. The District is an "Identified Project and <br />Process" in SWSL <br />OBJECTIVES <br />The project objectives include analysis of the water supply alternatives, hydraulic design <br />of the distribution system, generation of costs estimates, public outreach and input, <br />District Board selection of the preferred development plan and production of a Master <br />Plan or Preliminary Engineering Report. Please see the Tasks below for better <br />description of these objectives. <br />TASKS <br />Provide a detailed description of each task using the following format <br />TASK 1 — Distribution System Preliminary Design <br />Description of Task <br />The water distribution system will include approximately 200 miles of pipelines <br />throughout the District, which will be developed in phases as funds are available. This <br />task will develop an overall preliminary design for the distributions system. The <br />Distribution System Design will include hydraulic analysis of pipeline sizes and routes to <br />include fire flow and fire hydrant placement, assessment of pipeline ROW issues, <br />determination of storage tank locations and investigation of temporary or permanent <br />
The URL can be used to link to this page
Your browser does not support the video tag.