Laserfiche WebLink
CWCB Construction Fund Loan Application <br />6. Will the acquisition of additional water rights be necessar�? YES NO X <br />If YES, please explain. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS and PHONE <br />John Andrew, PhD, PE 5413 Taylor Lane, Ft. Collins, CO 80528; 970-227-2657 <br />Mayo Sommermeyer 323 S Colle�e Avenue, #3, Ft. Collins, CO 80524; 970-498-9900 <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />�, for the proposed project. Please submit one copy of each completed study with this application. _ <br />Complete removal of the old structure and outfall for inlet; modi slo�es and provide safetv <br />structures. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br />Estimated Engineering Costs: <br />Design and Surveying $80,000 <br />Construction Observation $10,000 <br />As-Built Survey $ 4,000 <br />As-Build Plans and Report $ 6,000 <br />Estimated Construction Costs: <br />Inlet Project $1,320,455 <br />, Estimated Other Costs: <br />Land Acquisition: $12,000 <br />Land Acquisition Legal Fees: $ 3,000 <br />Total: $ 100,000 <br />Total: $ 1,320,455 <br />Total: $ 15,000 <br />Total Estimated Costs: $ 1,432,455 <br />K3 <br />