Laserfiche WebLink
CWCB Const�uction Fund Loan Application <br />4. Please provide a brief description of the owner's e�sting water supply facilities and descnbe any <br />e�sting operational or maintenance problems. Attach separate sheets if needed, and a map of the <br />service area. Big Windsor Reservoir, Douglas Reservoir, #8 Reservoir, Annex Reservoir, <br />Elder Reservoir. Cobb Lake, Poudre Valley Ditcl�, S�ringer Ditch, Larimer & Weld Canal <br />Far existing facilities indicate: <br />Number of shareholders 256 <br />Current Assessment per share $ 375 <br />Number of acres irrigated 55,000 <br />or Number of customers served <br />Number of shares 1000 <br />Water Right: _400 CFS. <br />Average water diverted per year: _35,000_ acre-feet. <br />Part B. - Description of the Project <br />1. Name ofthe project or facility Cobb Lake <br />2. Purpose of this loan application. Check one. <br />New project <br />X <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (descnbe) <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? YES _ NO X_ <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. Larimer County Road 1 and Road 54 <br />� Structure is %2 mile west of this intersection. <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />Re�lacement and improvement of the inlet structure and outfall therefrom to the lake. Safet� <br />concerns to be addressed as well as inflow measuring capability. See feasibility studv for <br />detail. <br />F� <br />