My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153567 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153567 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 12:54:54 PM
Creation date
12/30/2009 10:28:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153567
Contractor Name
Grand Junction, City of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />G. Tfie State ayrees that it sF�a].1: <br />1. Loan tu the Contr�actor• for tFie constr•uctiori of tf�e <br />projcct an amount not to exceed Orie Hundr•�>d Ninety-Fiue <br />Thuusand Nine Hundred 7hirty Uollars and Tfiirty-Fi�e Cents <br />($195,93U.35). 5a�id On� Hundr���d Ninety-Fiue fhousand Nine <br />Hundr•ed lF�ir•ty Uollars arid Thirty-F'ive Cents ($195,930.35) <br />shal"1 be m�de aua�ilable to the Contr•actor in accordance <br />witti tl�e following terms ar�d cundJ.tioris: <br />a. Commencing ten (10) days fr•om ttie date of this <br />coritr•�ct and for euery month tfiereafter until said <br />project has been completed, the Contr•actor shall <br />prepare, with the assistance of the Consultant <br />r•eferr•ed to �in par•agr•aphi A.1. aboue, an estimate of <br />ttie funds required for project construction during <br />tfiat month and shall forward said estirnate to the <br />State not 7ess than fifteen (15) days F�rior to tfie <br />beginnirig of such morith. <br />b. Upon receiF�t and aF�proval by tfie State of sucfi <br />inonthly est�imate, tFie State wil'l, u�.ithin forty (40) <br />days fi�rom tfie receiF�t of such estimate, F�ay ouer to <br />the Contractor th� amount of the month'ly estimate or <br />such por�tion ther•eof as has been appr•ouea by thie <br />State. <br />c. No F>ayments will be maae under thiis contract <br />unless and unt�il tFie p• t plans and <br />specifications r� n paragraF�Fi A.1. abo�e <br />are approuc>d by t�����r wr it:irig . <br />d. Pr•oject constr c���t,�ligihle for payment <br />by the State sTa�b i� o tr,e cost of : <br />.(1) Pr•epar•�.rl firial designs and specificat�or�s <br />for the project. <br />(2) Pr•eparing bid ar�d construction contract <br />docurnents . <br />(3) Preparing enuironmental assessmE�nt or <br />envir•onrnental impact statem�nts, and utherurise <br />cumplying uiith the federal Nat�onal En�ironrtiental <br />Policy Act. <br />(4) Com�lying witl� all federal, State, and local <br />rcgulatory requir�ments, including the ootain�ing <br />of a71 r•eyuire�d permits . <br />(5) Land arid wat�.r rights acquisitions n��edNd fur <br />th�e pr�oject, incluoiny tFie necessary appra�sals <br />arid t�ualuatioris . <br />(6) Fish and wildl rtiitigation measur•es <br />rEacauir•ed by f�deral, State, or• local laws arid <br />r•e�gul�taons, <br />">> Flctual cunstr•uction as called for• in the bid <br />ciucurnents and iri Chanye Or•d��r�s ap�rv�cd t�y ti�i� <br />CorisultGnt, the Cantractor, the Construction Firm, <br />arid the State . <br />(8) EnyinE�er•.iny ser•vices f ur construction <br />man�+gement, in�:luding d��s'ign and cunstruction <br />manaycmcnt fur• �tat�-a�proue�d Change Order•s. <br />Pagc 2 of 5 pagc,s <br />
The URL can be used to link to this page
Your browser does not support the video tag.