Laserfiche WebLink
<br />- 2- <br /> <br />Field tour summary: Kent Wiley led participants around the Park and pointed out key spots at the <br />reservoir that will be impacted by the proposed 20,600 AF additional water supply pool. A <br />significant part of the swim beach will be inundated and would need similar flat terrain to replace it. <br />In the following picture the Corps employee is standing below a brown wooden plaque that shows <br />high water levels in 1995 when Chatfield had to hold flood water. The concessionaires have <br />developed a nice marina building and all the docks are anchored underwater to minimize tilt. The <br />marina building is pictured below and shows the effort put into making a nice facility by the Parks <br />concessionaire. The panoramic photo shows a boat launching site that would be buried after the <br />reservoir reallocation and the storage pool is full. <br /> <br />The Chatfield Reservoir <br />beach area - marina - boat launch area <br /> <br /> <br /> <br /> <br /> <br /> <br />~,.. <br />...................................................................................:.;............................................ <br /> <br /> <br /> <br />Reservoir Reallocation meeting summary: <br />The study objectives and additional tasks by the study contractor will require more non- federal cost <br />share to complete the study. What follows is a summary of meeting participants comments. <br /> <br />. Larry Lang - Do we want to have water interests put money in? In September maybe the <br />work group and interested parties need come to the CWCB meeting in Grand Junction. To <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />