My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOODC00109
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOODC00109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:21 AM
Creation date
9/30/2006 6:46:15 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Basin
South Platte
Title
Chatfield Reallocation Study: Meeting Minutes 8/7/03
Date
8/7/2003
Prepared For
Jefferson County / Arapahoe County
Floodplain - Doc Type
Meeting Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 2- <br /> <br />Field tour summary: Kent Wiley led participants around the Park and pointed out key spots at the <br />reservoir that will be impacted by the proposed 20,600 AF additional water supply pool. A <br />significant part of the swim beach will be inundated and would need similar flat terrain to replace it. <br />In the following picture the Corps employee is standing below a brown wooden plaque that shows <br />high water levels in 1995 when Chatfield had to hold flood water. The concessionaires have <br />developed a nice marina building and all the docks are anchored underwater to minimize tilt. The <br />marina building is pictured below and shows the effort put into making a nice facility by the Parks <br />concessionaire. The panoramic photo shows a boat launching site that would be buried after the <br />reservoir reallocation and the storage pool is full. <br /> <br />The Chatfield Reservoir <br />beach area - marina - boat launch area <br /> <br /> <br /> <br /> <br /> <br /> <br />~,.. <br />...................................................................................:.;............................................ <br /> <br /> <br /> <br />Reservoir Reallocation meeting summary: <br />The study objectives and additional tasks by the study contractor will require more non- federal cost <br />share to complete the study. What follows is a summary of meeting participants comments. <br /> <br />. Larry Lang - Do we want to have water interests put money in? In September maybe the <br />work group and interested parties need come to the CWCB meeting in Grand Junction. To <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.