My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150301 feas study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150301 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:57:47 AM
Creation date
12/28/2009 3:24:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-050
C150301
Contractor Name
Riverside Ditch and Allen Extension Company, The
Contract Type
Loan
Water District
11
County
Chaffee
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br />(Current feasibility study attached/enclosed) <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if l�own. <br />Estimated Engineering Costs: $ 21,100 <br />Estimated Construction Costs: $ 173,000 <br />Estimated Other Costs: $ 10.500 (contingency, legal, permitting) <br />Estnnated Total Costs: $ 204.600 <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $184.140 <br />Term (length) of loan: <br />Interest Rate: <br />30 years <br />�Y� � • �- r',' % <br />Part C. - Project Sponsor Financial Information <br />(Ma�cimwn 75-90 % of Est. Tota1 Costs) <br />�us,�ty lo, 20, � 3o y�) <br />(Please call for our current rates) <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. 'The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is also <br />requested that the project sponsor submit with this application, copies of the three most recent annual <br />reports, financial statements, corporate reports or other current documenta.tion of financial condition <br />and operations. <br />1. List any e�sting long-term liability (multi-year) or indebtedness that exceeds one thousand dollars. <br />For eacample, bank loans, government agency loans, bond issues, accounts payable, etc. Include <br />names and addresses of lenders, amounts, due dates and maturity dates. Attach a separate <br />schedule, if needed. <br />2. Are any of the above liabilities now in defiult, or been in default at any time in the past? YES <br />NO X . If YES, please give detailed explanation. <br />4 <br />Remaining Annual Maturity <br />Lender Name & Address Amount Payment Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.