My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150301 feas study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150301 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:57:47 AM
Creation date
12/28/2009 3:24:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-050
C150301
Contractor Name
Riverside Ditch and Allen Extension Company, The
Contract Type
Loan
Water District
11
County
Chaffee
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />4. Pease provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />The Riverside Ditch has not received much real repair and little improvement in recent decades. The <br />Com�anX did construct two siphons the cost of which was funded bX shareholder assessments usine a <br />CWCB loan. Those improvements are in effect the first steps of phased canal moderniza.tion and <br />repairs to a�me infrastructure. <br />Of particular concern at the present is the river diversion. The Companv has been unable to take their <br />full decreed flow because of the flow back to the river throu�h the wing wall that directs water toward <br />the river diversion head gate. The Company has been considering a number of phased improvements to <br />the canal which can be characterized as: <br />■ Repairs to the river diversion. <br />■ Linin�of portions of the canal. <br />■ Consideration of canal monitoring� (and potentiallv future gate actuation using supervisory <br />control and data acquisition1SCADA) equit�ment. <br />■ Phreatophvte removal and �TUrilri� <br />■ Installation removal, or repair of selected head gates and includin� a standardized downstream <br />flume. <br />These considered improvements, as �ronosed herein, would have the overall e�ect and benefit to the <br />RD&AEC shareholders throu�h: <br />• Improving overall canal operations and operational efficiencv. <br />■ Increasing consistency of shareholder head�ate deliveries. <br />■ Irnplementation of standardized companv-wide, wheeled headgates with standardized flumes <br />downstream. <br />■ Decreasin�operationalliabilities. <br />■ Reducin� unnecessary onerational spills. <br />6. Will the acquisition of additional water rights be necessar�? YES NO X <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />Engineer: Stephen Smith Ac�ua En�ineermg, Inc. 4803 Innovation Drive <br />Fort Collins, Colorado 80525 970-372-6108, swsmith(a�,aquaen .r�com <br />Attorney: Steven T. Monson Felt. Monson & Culichia, LLC 319 North Weber Street <br />Colorado Springs, Colorado 80903 970-372-6108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.