Laserfiche WebLink
TABLE 6 <br />ALTERNATIVE <br />Breach Gray #3 <br />South Grav Toe Drain 8 Access Ramp <br /> <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNITS UNIT <br />PRICE <br />SUBTOTALS <br />AMOUNT <br /> <br />1. Insurance, Bonds 1 L.S. $ 4,200.00 $__ 4,200 $ 4,200 <br />--- <br />2. -- -------------- <br />Mobilization, Demobilization ----- <br />1 <br />L.S. <br />$ 13,700.00 <br />$___ 13,700 <br />$__ 13,700 <br />3. Surveying 1 Each $ 6,000.00 $___ 6,000 $ 6,000 <br />4. Dewaterin /Erosion Control 21 __ D~ $ 500.00 $__ 10,500 $ 10,500 <br />5. __ <br />South Gray Lake _ <br />_ , <br /> _ ___ _ _ <br />Toe Drain Installation i ____ __ ___ <br />___ <br /> Strippin 1150 C.Y. $_ 3.00 $ 3,450 $ 3,500 <br /> Excavation 2800 C.Y. $ 8.00 $ 22,400 $ 22,400 <br /> C33 Sand; supply & place 1875 Tons $ 30.00 $ 56,250 $ 56,300 <br /> Gravel 8 Sand Blanket; supply 8. place 1 Tons $ 20,000.00 $ 20,000 $ 20,000 <br /> Drain Pipe 8" PVC); supply 8 place 2500 _ L.F. $` 16.00 $ 40,000 $ 40,000 <br /> Earth Cover 1675 C.Y. $ 5.00 $ 8,375 $ 8,400 <br /> Manholes 4 Each $ 3,500.00 $ 14,000 $ 14,000 <br /> Cleanouts 5 Each $ 1,500.00 $ 7,500 $__ 7,500 <br /> Measuring Weirs ~ 3 Each $ 1,500.00 $ 4,500 $ 4,500 <br /> $ 176,600 <br /> Access Road Construction 8 Ramp _ <br /> Strippin 500 C.Y. $ 3.00 $ 1,500 $ 1,500 <br /> Fill 2650 C.Y. $ 3.00 $ 7,950 $ 8,000 <br /> Roadbase 475 Tons $ 20.00 <br />- $ 9,500 $ 9;500 <br /> - ------ - $ 19,000 <br />6. Gra Lake No. 3 Breach - 65' w/ 8:1 Slopes <br /> Stri in 1370 C.Y. $ 3.00 $ 4,110 $ 4,200 <br /> Breach Excavation/Roadway Cut 6000 C.Y. $ 4.00 $ 24,000 $ 24,000 <br /> Spillwa Grading 1 L.S. $ 2,000.00 $ 2,000 $ 2,000 <br /> Roadway CWGradin 1000 C.Y. $ 4.00 $ 4,000 $ 4,000 <br /> Riprap, suppl a~d place 180 Tons $ 25.00 $_ 4,500 $ 4,500 <br /> Riprap Bedding, supplyand place 60 Tons $_ 25.00 $ 1,500 $ 1,500 <br /> ---- $ 40.200 <br /> <br />7. Spoil 3500 C.Y. $_ 1.75 $ 6,125 $ 6,200 <br /> <br />8. Seedin 5 Acres $ 3,000.00 $ 15,000 $ 15,000 <br /> <br />TOTAL CONSTRUCTION COST >»»»»»»»> S 291,400 <br />