TABLE 5
<br />GRAY LAKES
<br />ALTERNATIVE 1
<br />Breach Gray #3
<br />South Gray Toe Drain 8 Access Road @ Toe
<br />
<br />ITEM
<br />DESCRIPTION
<br />QUANTITY
<br />UNITS UNIT
<br />PRICE
<br />SUBTOTALS
<br />AMOUNT
<br /> --
<br />--
<br />
<br />1. -
<br />--
<br />----
<br />Insurance, Bonds
<br />7
<br />L.S.
<br />$ 4,300.00
<br />$ 4,300 -
<br />$ 4,300
<br />2. MobilizaGon, Demobilization ~ 1 L.S. $ 14,100.00 $ 14,100 $ 14,100
<br />3. Surve in 1 Each $ 6,000.00 $ 6,000 $ 6,000
<br />4. Dewaterin /Erosion Control 21 Days $ 500.00 $ 10,500 $ 10,500
<br />5. _ __ ,_
<br />South Gray Lake
<br /> Toe Drain Installation
<br />
<br />i Strippin
<br />--------- 1150 C.Y. $ 3.00 $ 3,450 $ 3,500
<br /> Excavation
<br />- - 2800 C.Y. $ 8.00 $ 22,400 $ 22,400
<br /> C33 Sand; supply 8 place 1875 Tons $ 30.00 $ 56,250 $ 56,300
<br /> Gravel 8 Sand Blanket; supply 8 place 7 L.S. $ 20,000.00 $ 20,000 $ 20,000
<br /> Drain Pipe (8" PVC); supply 8 place i 2500 L.F. $ 16.00 $ 40,000 $ 40,000
<br /> Earth Cover 1675 C.Y. $ 5.00 $ 8,375 $ 8,400
<br /> Manholes 4 Each $ 3,500.00 $ 14,000 $ 14,000
<br /> Cleanouts 5 Each $ 1,500.00 $ 7,500 $ 7,500
<br /> Measuring Weirs
<br />- 3 Each $ 1,500.00 $ 4,500 $ 4,500
<br /> -
<br />- - - - - - $ 176.600
<br /> Access Road Construction
<br /> SVippin 700 ^ C.Y. $ 3.00 $ 2,100 $ 2.100
<br /> Fill ~ 2500 C.Y. $ 3.00 $ 7,500 $ 7.500
<br /> Roadbase
<br />--
<br />- 980 Tons $ 20.00 $ 19,600 $ 19,600
<br /> - -
<br />- $ 29.200
<br />6. Gray Lake No. 3 Breach - 65' w/3:1 Slopes
<br /> SVipping 1400 C.Y. $ 3.00 $ 4,200 $ 4,200
<br /> Breach ExcavatioNRoadway Cut 4800 C.Y. $ 4.00 $ 19,200 $ 19,200
<br /> Spillway Gradin 1 L.S. $ 2,000.00 $ 2.000 $ 2,000
<br /> Roadwa CuUGrading 1700 C.Y. $ 4.00 $ 6,800 $ 6,800
<br />, Riprap, suppl and place 180 Tons $ 25.00 $ 4,500 $ 4,500
<br /> Riprap Bedding, supply and place 60 Tons $ 25.00 $ 1,500 $ 1,500
<br /> $ 38.200
<br />
<br />7. Spoil 3600 C.Y. $ 1.75 $ 6,300 $ 6,300
<br />
<br />8. Seeding 5 Acres $ 3,000.00 $ 15,000 $ 15,000
<br />
<br />TOTAL CONSTRUCTION COST >»»»»»»»» S 300,200