Laserfiche WebLink
TABLE 5 <br />GRAY LAKES <br />ALTERNATIVE 1 <br />Breach Gray #3 <br />South Gray Toe Drain 8 Access Road @ Toe <br /> <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNITS UNIT <br />PRICE <br />SUBTOTALS <br />AMOUNT <br /> -- <br />-- <br /> <br />1. - <br />-- <br />---- <br />Insurance, Bonds <br />7 <br />L.S. <br />$ 4,300.00 <br />$ 4,300 - <br />$ 4,300 <br />2. MobilizaGon, Demobilization ~ 1 L.S. $ 14,100.00 $ 14,100 $ 14,100 <br />3. Surve in 1 Each $ 6,000.00 $ 6,000 $ 6,000 <br />4. Dewaterin /Erosion Control 21 Days $ 500.00 $ 10,500 $ 10,500 <br />5. _ __ ,_ <br />South Gray Lake <br /> Toe Drain Installation <br /> <br />i Strippin <br />--------- 1150 C.Y. $ 3.00 $ 3,450 $ 3,500 <br /> Excavation <br />- - 2800 C.Y. $ 8.00 $ 22,400 $ 22,400 <br /> C33 Sand; supply 8 place 1875 Tons $ 30.00 $ 56,250 $ 56,300 <br /> Gravel 8 Sand Blanket; supply 8 place 7 L.S. $ 20,000.00 $ 20,000 $ 20,000 <br /> Drain Pipe (8" PVC); supply 8 place i 2500 L.F. $ 16.00 $ 40,000 $ 40,000 <br /> Earth Cover 1675 C.Y. $ 5.00 $ 8,375 $ 8,400 <br /> Manholes 4 Each $ 3,500.00 $ 14,000 $ 14,000 <br /> Cleanouts 5 Each $ 1,500.00 $ 7,500 $ 7,500 <br /> Measuring Weirs <br />- 3 Each $ 1,500.00 $ 4,500 $ 4,500 <br /> - <br />- - - - - - $ 176.600 <br /> Access Road Construction <br /> SVippin 700 ^ C.Y. $ 3.00 $ 2,100 $ 2.100 <br /> Fill ~ 2500 C.Y. $ 3.00 $ 7,500 $ 7.500 <br /> Roadbase <br />-- <br />- 980 Tons $ 20.00 $ 19,600 $ 19,600 <br /> - - <br />- $ 29.200 <br />6. Gray Lake No. 3 Breach - 65' w/3:1 Slopes <br /> SVipping 1400 C.Y. $ 3.00 $ 4,200 $ 4,200 <br /> Breach ExcavatioNRoadway Cut 4800 C.Y. $ 4.00 $ 19,200 $ 19,200 <br /> Spillway Gradin 1 L.S. $ 2,000.00 $ 2.000 $ 2,000 <br /> Roadwa CuUGrading 1700 C.Y. $ 4.00 $ 6,800 $ 6,800 <br />, Riprap, suppl and place 180 Tons $ 25.00 $ 4,500 $ 4,500 <br /> Riprap Bedding, supply and place 60 Tons $ 25.00 $ 1,500 $ 1,500 <br /> $ 38.200 <br /> <br />7. Spoil 3600 C.Y. $ 1.75 $ 6,300 $ 6,300 <br /> <br />8. Seeding 5 Acres $ 3,000.00 $ 15,000 $ 15,000 <br /> <br />TOTAL CONSTRUCTION COST >»»»»»»»» S 300,200 <br />