My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150295 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150295 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:29 PM
Creation date
10/14/2009 1:08:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-038
C150295
Contractor Name
Dillon, Town of
Contract Type
Loan
Water District
0
County
Summit
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
787
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />6. Will the acquisition of additional water rights be necessary? YES NO X <br />If YES, please explain. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />NAME <br />ADDRESS and PHONE <br />Ray D. Tenney, P.E. Colorado River Water Conservation District P.O. Box 1120 <br />Glenwood Springs, CO 81601 Telephone (970)945-8522 x220 <br />Steven P. Jeffers, Bernard Lyons Gaddis & Kahn, PC, 515 Kimbark Street, 2nd Floor, <br />Longmont, CO 80501 Telephone (303)776-9900 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Please See Attached <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs: $ 153,000 <br />Estimated Construction Costs: $ 1,500,000 <br />Estimated Other Costs: $ 75,000 (land acquisition, water rights purchase,etc.) <br />Estimated Total Costs: $ 1,728,000 <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 1,500,000 (Maximum 75-90 % of Est. Total Costs) <br />Term (length) of loan: 30 vears (Usually 10, 20, or 30 years) <br />Interest Rate: 4% (Please call for our current rates) <br />Part C. - Project Sponsor Financial Information <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the financial capacity to repay any loans made by the CWCB. The following <br />information is needed to assist the CWCB in a preliminary assessment of the applicant's <br />financial capacity. It is also requested that the project sponsor submit with this application, <br />copies of the three most recent annual reports, financial statements, corporate reports or other <br />current documentation of financial condition and operations. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.